PIPING LEED SYSTEM COMMISSIONING CARBONATION PLUMBING SYMBOL LEGEND ABBREVIATIONS
<br /> SOIL,WASTE,AND VENT PIPING CONTRACTOR RESPONSIBILITIES FOR BUILDING COMMISSIONING STARBUCKS CARBONATION VENDOR WILL PROVIDE AND INSTALL S OR W SANITARY OR WASTE PIPING ABOVE SLAB AFF ABOVE FINISHED FLOOR
<br /> SEE SPECIFICATIONS FOR PIPE MATERIALS. ALL HORIZONTAL RUNS SHALL EQUIPMENT,CO2 TANKS AND FITTINGS. STARBUCKS SHALL PROVIDE AND AHJ AUTHORITIES HAVING JURISDICTION
<br /> DRAIN AT A GRADE OF 1/4"PER FOOT(21MM PER METER)WHERE POSSIBLE CONTRACTOR SHALL PROVIDE SUPPORT AND WORK AS SPECIFIED, NEEDED AND CONTRACTOR SHALL INSTALL CO2 TANK MOUNTING BRACKET, PROTECTIVE S OR W SANITARY OR WASTE PIPING BELOW SLAB APPROX APPROXIMATE
<br /> BUT IN NO CASE LESS THAN 1/8"PER FOOT(10MM PER METER)WHERE REQUIRED TO CONDUCT AND FACILITATE STARBUCKS STAFF BUILDING COMMISSIONING SHELVING UNIT AND CO2 GAS TUBING AS SHOWN ON DRAWINGS AND PER
<br /> ALLOWED&SIZED PER AHJ AND CODE. EFFORTS.THIS WORK WILL BE COMPRISED OF THREE DISTINCT EFFORTS: MANUFACTURER'S INSTRUCTIONS. MAXIMUM TUBING LENGTH INCLUDING -------- V VENT PIPING BLDG BUILDING
<br /> 1) SUPPORT STARBUCKS COMMISSIONING AGENT(CXA)DURING COILED ENDS IS 100 FT(30 M)AND MAXIMUM BEND IS TO 31NCH (75 MM) GW GW GREASE WASTE
<br /> COORDINATE WITH LOCAL AUTHORITIES FOR DRAINAGE REQUIREMENTS INSTALLATION VERIFICATION AND CORRECT DISCLOSED DEFICIENCIES; MINIMUM RADIUS. ROUTE CO2 TUBING PREFERABLY THROUGH WALL CLG CEILING
<br /> FOR EQUIPMENT DESIGNATED WITH INDIRECT WASTE TO FLOOR SINKS. 2) PERFORM TESTING,ADJUSTING, BALANCING AND SYSTEM STARTUP AND/OR CEILING CAVITIES, WITHOUT KINKS AND SO AS TO NOT TOUCH ANY — CD— CD CONDENSATE DRAIN CONST CONSTRUCTION
<br /> PROVIDE PIPED DRAIN (P-TRAP AND VENT)TO SANITARY IF REQUIRED BY AND SUPPORT FUNCTIONAL PERFORMANCE TESTING BY STARBUCKS CXA; HOT SURFACE(BALLAST,STEAM PIPE,ETC.)OR RUB AGAINST A SHARP CW DOMESTIC COLD WATER
<br /> LOCAL JURISDICTION. 3) CORRECT DEFICIENCIES DISCLOSED BY FUNCTIONAL PERFORMANCE EDGE THAT MAY ABRADE OR CUT TUBING. WHERE TUBING IS ROUTED CW COLD WATER PIPING CXA COMMISSIONING AGENT
<br /> TESTING AND SUBMIT REPORTS.CONTRACTOR SHALL PERFORM AND THROUGH CONCEALED CAVITIES,PROVIDE A NON-FLEXIBLE CONDUIT HW HOT WATER PIPING
<br /> q )0
<br /> CONDENSATE DRAINAGE PIPING PROVIDE THE FOLLOWING: SLEEVE SIZED TO ALLOW THE MINIMUM BENDING RADIUS STATED ABOVE DEG DEGREES
<br /> THE PLUMBING CONTRACTOR SHALL PROVIDE CONDENSATE DRAINS FOR AND TO ALLOW EASY REMOVAL OF TUBING. ALL HOLES MUST BE SEALED —CWF— CWF COLD WATER FILTERED ON DOWN I ©2017 STARBUCKS COFFEE COMPANY
<br /> AIR HANDLING UNITS AND STARBUCKS EQUIPMENT(REFER TO SCHEDULE). A. SYSTEMS SUBJECT TO COMMISSIONING MAY INCLUDE, BUT ARE WITH A GROMMET OR ESCUTCHEON. TUBING IS TO BE SECURED TO DTL DETAIL
<br /> CONDENSATE DRAINAGE PIPING SHALL BE TYPE"M"COPPER TUBING WITH NOT LIMITED TO, DOMESTIC HOT WATER GENERATION, HVAC APPROPRIATE PERMANENT SURFACES TO KEEP IT OFF THE FLOOR OR —CWN— CWN COLDWATER NANO FILTERED DWG(S) DRAWING(S) STARBUCKS COFFEE
<br /> WROUGHT COPPER SWEAT FITTINGS JOINED WITH 50/50 SOLDER. SYSTEMS, ROOFTOP UNITS, EXHAUST FANS, HVAC CONTROLS, CABINET BOTTOMS AND AWAY FROM OTHER EQUIPMENT. LABEL BOTH —CWS— CWS COLD WATER SOFTENED
<br /> LIGHTING CONTROLS,AIR CURTAINS, BUILT-IN REFRIGERATION ENDS OF TUBING AND REGULARLY AT TEN (10)FOOT INTERVALS ALONG EA EACH COMPANY
<br /> HANGERS AND SUPPORTS EQUIPMENT,AND RENEWABLE ENERGY SYSTEMS. ROUTE AS"CO2." EC ELECTRICAL CONTRACTOR
<br /> THE PLUMBING CONTRACTOR SHALL FURNISH ALL PIPE SUPPORTS —TW— TW TEMPERED WATER ELEC ELECTRICAL
<br /> REQUIRED FOR EQUIPMENT AND MATERIAL IN ACCRODANCE WITH B. CONTRACTOR SHALL INCLUDE COMMISSIONING ACTIVITIES IN —RD— RD REVERSE OSMOSIS WATER EMER EMERGENCY 2401 UTAH AVENUE SOUTH
<br /> SPECIFICATIONS. ALL HORIZONTAL RUNS OF PIPING SHALL BE SUPPORTED PROJECT SCHEDULE AND SHOW INTERVALS FOR PERFORMANCE EXIST EXISTING SEATTLE, WASHINGTON 98134
<br /> BY PIPE HANGERS INSTALLED AS REQUIRED BY LOCAL CODES. ADDITIONAL OF WORK FOR WHICH CONTRACTOR IS RESPONSIBLE AND —G— G GAS PIPING EXT EXTERIOR (206) 318-1575
<br /> SUPPORTS SHALL BE PROVIDED WHERE REQUIRED TO PREVENT SAGGING. INTERVALS FOR WORK PERFORMED BY STARBUCKS CXA.
<br /> CONTRACTOR SHALL SHOW RESOURCES FOR PERFORMING ALL NITROGENATION RD RD REFRIGERANT DISCHARGE PIPING FD FLOOR DRAIN
<br /> CONNECTIONS WORK RELATED TO COMMISSIONING ACTIVITIES ON A LINE ITEM IN FS FLOOR SINK THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> INSTALL UNIONS ADJACENT TO EACH VALVE AND AT FINAL CONNECTION TO THE SCHEDULE OF VALUES. —RS— RS REFRIGERANT SUCTION PIPING CONFIDENTIAL AND SHALL REMAIN THE SOLE
<br /> EACH PIECE OF EQUIPMENT. INSTALL DIELECTRIC COUPLINGS TO STARBUCKS NITROGENATION VENDOR WILL PROVIDE AND INSTALL F&I FURNISH&INSTALL PROPERTY OF STARBUCKS CORPORATION,
<br /> CONNECT PIPING MATERIALS OF DISSIMILAR METALS. C. CONTRACTOR SHALL INSTALL EQUIPMENT IN ACCORDANCE WITH EQUIPMENT,NITROGEN TANKS AND FITTINGS. STARBUCKS SHALL FLR FLOOR WHICH IS THE OWNER OF THE COPYRIGHT IN
<br /> THE MANUFACTURER'S REQUIREMENTS AND ALL CONTRACT PROVIDE AND CONTRACTOR SHALL INSTALL TANK MOUNTING BRACKET(S). BV BALL VALVE FT FOOT/FEET THIS WORK. THEY SHALL NOT BE
<br /> FCO FLOOR CLEANOUT REPRODUCED(IN WHOLE OR IN PART),SHARED
<br /> CLEANOUTS DOCUMENTS. ENSURE THAT ALL EQUIPMENT IS INSTALLED
<br /> PROVIDE FLOOR AND WALL CLEANOUTS AS INDICATED ON THE DRAWINGS TOTALLY COMPLETE,AND ACCESSIBLE TO STARBUCKS CXA FOR D4 GV GATE VALVE GC GENERAL CONTRACTOR WITH THIRD PARTIES OR USED IN ANY MANNER
<br /> OR WHERE REQUIRED BY CODE IN ALL SOIL,WASTE,AND DRAIN LINES.SEE INSTALLATION VERIFICATION AND FUNCTIONAL PERFORMANCE GFCI GROUND FAULT CIRCUIT INTERRUPTER ON OTHER PROJECTS OR EXTENSIONS TO THIS
<br /> SPECIFICATIONS FOR TYPES. CLEANOUTS SHALL BE SAME SIZE AS PIPE TESTING PRIOR TO THE SCHEDULED START OF INSTALLATION \� CH.V CHECK VALVE GW GREASE WASTE PROJECT WITHOUT THE PRIOR WRITTEN
<br /> EXCEPT THAT CLEANOUTS LARGER THAN 4"WILL NOT BE REQUIRED. VERIFICATION. CONSENT OF STARBUCKS CORPORATION.
<br /> HR HOUR THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> INSTALLATION D.INSTALL PIPING FREE OF SAGS AND BENDS. PROVIDE BRACKET STARBUCKS CLXA?COONTRACTORI HON ALL SUPPORT STARBUCKS CXA PLUMBING FIXTURES SHALL BE PERFORMED BYRV RELIEF VALVE HVAC HAICONDITIIONING AND AIR PROTOTYPICAL STARBUCKSINTENDED TO EXPRESS TGN ORE(WHICINTENTOH IS
<br /> STANDOFFS FROM MOUNTING SURFACES SUFFICIENT TO ALLOW 1"(25MM) INSTALLATION VERIFICATION EFFORTS AS NECESSARY. PROVIDE HW HOT WATER SUBJECT TO CHANGE AT ANYTIME)AND DO
<br /> OF CLEANING SPACE ALL AROUND PIPING, INCLUDING ANY ADDED PIPING ALL ACCESS AND EQUIPMENT NECESSARY FOR STARBUCKS STAFF HB HOSE BIBS HS HANDSINK NOT REFLECT ACTUAL SITE CONDITIONS.
<br /> INSULATION, INSTALL FITTINGS FOR CHANGES IN DIRECTION AND BRANCH TO VERIFY THAT THE EQUIPMENT IS INSTALLED CORRECTLY. WATER HEATER HWS HOT WATER SUPPLY NEITHER PARTY SHALL HAVE ANY OBLIGATION
<br /> CONNECTIONS. INSTALL SLEEVES FOR PIPES PASSING THROUGH SIZE WATER HEATER PER STARBUCKS STANDARD AND PER AUTHORITIES Q SHOCK ABSORBER HWR HOT WATER RETURN NOR LIABILITY TO THE OTHER EXCEPT STATED
<br /> CONCRETE AND MASONRY WALLS,GYPSUM BOARD PARTITIONS, E. CONTRACTOR SHALL BE READILY AVAILABLE DURING HAVING JURISDICTION (AHJ),WHICHEVER IS MORE STRINGENT. PROVIDE A
<br /> CONCRETE FLOOR AND ROOF SLABS. SEAL PIPE PENETRATIONS INSTALLATION VERIFICATION TO CORRECT ANY DEFICIENCIES OR GLASS-LINED, ENERGY EFFICIENT,GAS FIRED(OR ELECTRIC EQUIVALENT) ABOVE)UNTIL A WRITTEN AGREEMENT IS
<br /> THROUGH RATED CONSTRUCTION WITH FIRE DEFECTS DISCLOSED BY THE INSTALLATION VERIFICATION WATER HEATER(SEE SPECIFICATIONS). PROVIDE INSTALLATION COMPLETESTRAINER LL LANDLORD FULLY EXECUTED BY BOTH PARTIES.
<br /> STOPPING SEALANT MATERIAL PER CODE REQUIREMENTS. DO NOT PROCESS. CORRECTIONS SHALL BE MADE IN A TIMELY MANNER WITH FITTINGS AS SHOWN IN THE DRAWINGS. SET HOT WATER TEMPERATURE ~ LV LOW VOLTAGE
<br /> INSTALL PEX PIPING IN RATED WALLS OR THROUGH RATED FLOORS. WITHOUT DISRUPTION OF THE CONSTRUCTION SCHEDULE. AT 120°F OR ADJUST AS REQUIRED BY AHJ. PROVIDE THERMOMETER ON HOT STARBUCKS TEMPLATE EVERSION
<br /> WATER PIPE LEAVING WATER HEATER. WCO WALL CLEANOUT MAX MAXIMUM
<br /> INSTALL PER MANUFACTURER'S INSTRUCTIONS AND ENSURE PROPER MC MECHANICAL CONTRACTOR
<br /> PROTECTION OF PEX PIPING FROM METAL EDGES. UNDERGROUND WATER F. ALL HVAC, EXHAUST FAN,AND AIR CURTAIN EQUIPMENT SHALL BE WATER FILTRATIONMDP MAIN DISTRIBUTION PANEL
<br /> AND SEWER LINES SHALL BE LAID IN SEPARATE TRENCHES WITH A MINIMUM TESTED,ADJUSTED AND BALANCED BY THE CONTRACTOR'S FCO FLOOR CLEANOUT MECH MECHANICAL
<br /> HORIZONTAL SPACING AS REQUIRED BY CODE, EXCAVATED TO THE TESTING,ADJUSTING AND BALANCE AGENT(SEE TESTING, STARBUCKS WATER FILTRATION VENDOR WILL PROVIDE FILTRATION SYSTEM. MEP MECHANICAL, ELECTRICAL,AND PLUMBING
<br /> PROPER DEPTH AND GRADED TO PRODUCE THE REQUIRED FALL. ADJUSTING AND BALANCING AFTER THE SYSTEM IS VERIFIED TO CONTRACTOR SHALL CONFIRM WITH STARBUCKS CONSTRUCTION MANAGER
<br /> WHETHER VENDOR OR PLUMBING CONTRACTOR IS TO INSTALL FILTRATION ® FS FLOOR SINK MFG MANUFACTURER
<br /> BE COMPLETE AND CORRECT BY STARBUCKS CTA, IN SYSTEM. PROVIDE AND COORDINATE INSTALLATION COMPLETE WITH ALL MIN MINIMUM
<br /> TESTING ACCORDANCE WITH THE REQUIREMENTS OF THESE DOCUMENTS.
<br /> ALL PIPES SHALL BE TESTED BY AN APPROVED METHOD BEFORE THEY ARE ALL HVAC CONTROL SYSTEMS SHALL MS MOP SINK
<br /> TESTED TO ENSURE THAT PIPING, FITTINGS,AND EQUIPMENT AS INDICATED ON THE DRAWINGS. WM WATER METER
<br /> BACKFILLED OR CONCEALED.AFTER TESTING IS COMPLETE,THE PLUMBING CONTROL DEVICES,COMPONENTS, EQUIPMENT AND SYSTEMS CONNECTIONS NL NIGHTLIGHT
<br /> REQUIRED THESE PLANS AND SPECIFICATIONS.ONS.SEQUENCES OF OPERATION
<br /> CONTRACTOR SHALL DISINFECT THE POTABLE WATER SYSTEM AS ARE CALIBRATED,ADJUSTED AND OPERATE IN ACCORDANCE WITH THE PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS TO �
<br /> A FILTERS,TRAPS, CHECKS VALVES,VACUUM BREAKERS,AND FLEXIBLE AND PC PLUMBING CONTRACTOR POC CONNECT TO EXISTING NTS NOT TO SCALE
<br /> BY LOCAL AUTHORITY.TEST WATER PURITY ACCORDING TO LOCAL SHALL TESTED TO ENSURE THAT THEY OPERATE IN EQUIPMENT INCLUDING REQUIRED MATERIAL SUCH AS PIPING,VALVES,
<br /> REQUIREMENTS AND SUBMIT CERTIFIED TEST RESULTS TO ENGINEER FOR ACCORDANCE WITH THE CONTRACT REQUIREMENTS. PS PREP SINK
<br /> REVIEW AND APPROVAL. DELIVERABLES: PRELIMINARY,WRITTEN TESTING AND AIR RIGID TUBING. POC POINT OF CONNECTION . ....,
<br /> IDENTIFICATION SPECIBALAFIED HEREIN, OCUUMENT NG THECE REPORT CONFORMING TO INFORMATION ESPECIFIED,NTS SCHEDULES REF REFERENCE ACIES
<br /> PROVIDE PIPE IDENTIFICATION EVERY 10 FT(EXCEPT WHERE PIPES ARE ETC.TO THE STARBUCKS CXA IMMEDIATELY UPON COMPLETION REFER TO SCHEDULES ON DRAWINGS FOR A DESCRIPTION OF LISTED ITEMS RED D REQUIRED ENGINEERING ed 4•i
<br /> EXPOSED TO PUBLIC) IN ACCORDANCE WITH SPECIFICATIONS. OF THE WORK. AND FURNISH ANY AND ALL PLUMBING FIXTURES LISTED FIXTURES
<br /> ANY REV REVISION 3371 olmn Sl99
<br /> DISCREPANCIES ABOUT WHO IS TO PROVIDE PLUMBING FIXTURES IN THE Santa Clara,CA 95054 a
<br /> G. CONTRACTOR SHALL INFORM STARBUCKS CXA WHEN EQUIPMENT SCHEDULE SHALL BE BROUGHT TO STARBUCKS ATTENTION FOR CLARIFICATION. ph:(406)522535 I #
<br /> O
<br /> IS READY FOR FUNCTIONAL PERFORMANCE TESTING,ALL INSTALL ALL FIXTURES LISTED REGARDLESS OF WHO SUPPLIES. SFT SHEET SQUARE FEET k:(d09I521-5260 •••i•r��'fCggNt�ap,`�,.'
<br /> EQUIPMENT SHALL BE READY FOR FUNCTIONAL PERFORMANCE SPECS SPECIFICATION(S) Copy®ht©2016 •+mer Cgttr•'
<br /> TESTING PRIOR TO STARTING TESTING. CONTRACTOR SHALL HAND SINK SST STAINLESS STEEL -
<br /> VALVES OPERATE EQUIPMENT FOR STARBUCKS CXA AND VERIFY BY IF FAUCET HAS A TEMPERATURE LIMIT STOP, IT IS TO BE REMOVED SO THAT
<br /> DEMONSTRATION THE CORRECT OPERATION OF EQUIPMENT, TEMPERED WATER FROM THE WATER HEATER IS NOT FURTHER REDUCED. TEL TELEPHONE
<br /> GENERALRESPONSE OF SENSORS,AND PROPER EXECUTION OF HVAC HOT WATER 100'- 110' F(34--43"C)MUST BE ABLE TO REACH SINK WITHIN
<br /> PLUMTEMP TEMPORARY
<br /> CONTROL AND LIGHTING SEQUENCES; INCLUDING BUT NOT 15 SECONDS.
<br /> PLUMBING CONTRACTOR TO PROVIDE VALVES WHERE INDICATED ON PLANS TMV TEMPERATURE MIXING VALVE
<br /> AND AS NECESSARY FOR PROPER SYSTEM OPERATION AND COMPONENT LIMITED TO,AIR MOVEMENT,TEMPERATURE,SOUND,AND UTILITY SINKS TW TEMPERED HOT WATER
<br /> ISOLATION. SEE SPECIFICATIONS FOR TYPES. INSTALL VALVES FOR EACH CONTROL RESPONSE. PROVIDE ANY SECURITY ACCESS, UTILITY SINKS ARE TO DELIVER A WATER TEMPERATURE RANGE OF TYP TYPICAL
<br /> FIXTURE AND ITEM ST EQUIPMENT. HARDWARE, SOFTWARE, OR OTHER SUPPORT AS NEEDED FOR
<br /> PROVIDE BRAIDED STAINLESS STEEL HOSE(UNLESS OTHERWISE NOTED) THE STARBUCKS CXA TO EFFICIENTLY WITNESS AND DOCUMENT 110"-120° F(43"-49"C). LINO UNLESS NOTED OTHERWISE
<br /> STARBUCKS CXA WILL RECORD THE
<br /> BETWEEN VALVE AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S ALL EQUIPMENT TESTING. DISHWASHER
<br /> SPECIFICATIONS. LOCATE SHUT-OFF VALVES ADJACENT TO EQUIPMENT FOR EQUIPMENT OPERATION AND RESPONSE TO TESTING SEQUENCES AND PREPARE A LIST OF ANY DEFICIENCIES DISCLOSED BY THE G.C.TO FURNISH AND INSTALL POWER CORD FOR DISH MACHINE PER V VENT
<br /> EASY ACCESS SUCH THAT VALVES CAN BE REACHED WITHOUT MOVING
<br /> FUNCTIONAL PERFORMANCE TESTS FOR CORRECTION BY THE JURISDICTIONAL REQUIREMENTS. IF EQUIPMENT IS SPECIFICED AS W SANITARY WASTE N
<br /> EQUIPMENT. SHUT OFF VALVES TO BE BALL TYPE.VALVES SHALL BE CONTRACTOREQUIPMENT INCLUDESBUT IS NOT LIMITED TOAIR HOBART ADVANSYS,THE UNIT IS TO BE PLUMBED WITH COLD, NON-FILTERED O CLEANOUT LC)
<br /> . , , WCWALL LEANU
<br /> LISTED/APPROVED FOR USE PER AUTHORITIES HAVING JURISDICTION(AHJ) WATER. IF THE WATER FILTRATION SYSTEM IS A PENTAIR CONFIGURATION II Q 0')HANDLING UNITS,ROOFTOP AND SPLIT TYPE,CONDENSING UNITS, WH WATER HEATER
<br /> AND CODE REQUIREMENTS. PROVIDE VALVE IDENTIFICATION PER THE OR III,THEN THE COLD, NON-FILTERED WATER MUST ALSO BE SOFTENED. > W
<br /> SPECIFICATIONS FOR MAIN WATER SERVICE SHUT-OFF AND ANY OTHER EXHAUST FANS,LIGHTING CONTROLS,ETC. DELIVERABLES: WP WEATHER PROOF
<br /> VALVES WHICH ARE NOT CLEARLY EVIDENT WHAT THEY SERVE. PROVIDE COMPLETED COPIES OF ALL START UP REPORTS, FILLED _ 07) U
<br /> OUT ON THE MANUFACTURER'S FORMS,TO THE STARBUCKS CXA. (Y)
<br /> SUPPLY WATER SERVICE H. CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY ISSUES OR 6
<br /> IF WATER PRESSURE SUPPLIED TO STORE IS GREATER THAN 65 PSI, DEFICIENCIES DISCLOSED DURING THE FUNCTIONAL 06 Z
<br /> PROVIDE A PRESSURE REGULATOR IN MAIN SUPPLY TO REDUCE WATER PERFORMANCE TESTING PROCESS.CORRECTIONS SHOULD BE GENERAL NOTES LANDLORD REQUIREMENTS
<br /> PRESSURE. PROVIDE BACKFLOW PREVENTION ON WATER SERVICE 0 = O
<br /> MADE IN A TIMELY MANNER WITHOUT DISRUPTION TO THE SYSTEM
<br /> IF REQUIRED BY LOCAL CODES. .AND CONSTRUCTION SCHEDULE.
<br /> THERMOSTATIC MIXING VALVE SCOPE PRIOR TO BID: THE CONTRACTOR SHALL COORDINATE WITH LANDLORD/ GENERAL PLUMBING NOTES Q UJ Y
<br /> J. CONTRACTOR SHALL BE READILY AVAILABLE FOR ANY RE-TESTING THE INTENT OF THE SPECIFICATIONS AND THE DRAWINGS IS TO PROVIDE A BUILDING OWNER FOR ANY CONSTRUCTION REQUIREMENTS/ U) (•�
<br /> PROVIDE A SINGLE THERMOSTATIC MIXING VALVE(TMV)LOCATED AT HOT OF EQUIPMENT DEEMED NECESSARY BY STARBUCKS CXA DURING COMPLETE AND FULLY OPERATIONAL PLUMBING SYSTEM.THE SPECIFICATONS. IF LANDLORD/BUILDING OWNER DOES HAVE O lL Q LU
<br /> WATER TANK AND SET FOR 110° (ORAS REQUIRED A AHJ) R SERVE HAND INSTALLATION VERIFICATION AND FUNCTIONAL PERFORMANCE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL,AND EQUIPMENT REQUIREMENTS,CONTRACTOR SHALL BECOME COMPLETELY FAMILIAR WITH 1. PLUMBING CONTRACTOR SHALL COORDINATE WITH THE GENERAL LU r^ O
<br /> SINKS.MIXING VALVE TO BE INSTALLED PER MANUFACTURER'S Q Q V �—
<br /> REQUIREMENTS WITH CHECK VALVES AT SUPPLY INLETS. PROVIDE TESTING.CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY RELATED TO THE INSTALLATION OF THE PLUMBING WORK. REQUIREMENTS/SPECIFICATIONS AND ADHERE TO THEM. WHERE LANDLORD CONTRACTOR TO PATCH AND REPAIR ALL EXISTING WALLS, FLOORS, Z Q
<br /> THERMOMETER ON OUTLET OF TMV. SEE SPECIFICATIONS FOR ISSUES OR DEFICIENCIES FOUND IN THE SYSTEM DURING ANY AND /BUILDING OWNER REQUIREMENTS ARE MORE STRINGENT THAN SHOWN IN CEILINGS OR OTHER SURFACES IDENTIFIED TO REMAIN THAT MAY BECOME
<br /> REQUIREMENTS. ALL RE-TESTING.CORRECTIONS SHOULD BE MADE IN A TIMELY SITE EXAMINATION THESE PLANS(IN THE OPINION OF THE ENGINEER). LANDLORD/BUILDING DAMAGED DURING THE COURSE OF WORK. F 2 uj Z Q
<br /> MANNER WITHOUT DISRUPTION TO THE SYSTEM AND THE CONTRACTOR SHALL THOROUGHLY EXAMINE ALL AREAS WHERE OWNER REQUIREMENTS SHALL GOVERN. U U U
<br /> CONSTRUCTION SCHEDULE.DELIVERABLES: FINAL BALANCE FIXTURES, EQUIPMENT,AND PIPING WILL BE INSTALLED AND WILL REPORT W W Lf)
<br /> REPORT, DEFICIENCIES LIST NOTING CORRECTIVE ACTIONS ANY CONDITION THAT, IN HIS OPINION, PREVENTS THE PROPER 2. EXPOSED/SURFACE MOUNTED PIPING IS ONLY ALLOWED IN THE BAR 1m 0 Q
<br /> PERFORMED BY CONTRACTOR IN RESPONSE TO INSTALLATION INSTALLATION OF THE PLUMBING WORK. AREA UNDER COUNTERTOPS,WHERE IT DOES NOT OBSTRUCT 0 0 QO Ix O
<br /> VERIFICATION AND FUNCTIONAL PERFORMANCE TEST RESULTS. CABINETS/DEVICES AND WHERE APPROVED BY STARBUCKS 0- Q D- qt LL of
<br /> INSULATION STANDARDS CONSTRUCTION MANAGER. IF ROUTED THROUGH CABINETS, IT SHALL
<br /> K. CONSTRUCTION AND POST CONSTRUCTION TESTING:ADDITIONAL EQUIPMENT AND MATERIALS SHALL CONFORM WITH THE APPROPRIATE BE ROUTED TO MAXIMIZE STORAGE SPACE AND BE PROTECTED
<br /> WATER PIPING TESTING MAY BE REQUIRED BY LEED AND OTHER PROCESSES PROVISIONS OF CSA, ULC,ASME,ASTM, UL,NEMA,ANSI,ASHRAE, NFPA,AS FROM DAMAGE. STORE #: 10183
<br /> PROVIDE THERMAL INSULATION PER THE SPECIFICATIONS. UNLESS THAT MAY OCCUR OUT OF SEQUENCE WITH COMMISSIONING APPLICABLE TO EACH INDIVIDUAL UNIT OR ASSEMBLY.
<br /> OTHERWISE REQUIRED BY THE LOCAL AUTHORITY OR ENERGY CODES,THE SERVICE. CONTRACTOR SHALL CONDUCT, DOCUMENT, SUPPORT PROJECT #: 27237-038
<br /> CODES 3. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL INTENT OR
<br /> AND SCHEDULE THIS TESTING AS DIRECTED BY STARBUCKS CXA.
<br /> MINIMUM INSULATION LEVELS SHALL BE AS FOLLOWS: ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL ARRANGEMENT OF SYSTEM(S). FURNISH AND INSTALL ALL CASEWORK CONCEPT:
<br /> PIPE SIZE(DIAMETER) INSULATION THICKNESS APPLICABLE PROVINCIAL AND LOCAL CODES AND ORDINANCES. IN CASE OF COMPONENTS NEEDED WHETHER INDICATED OR NOT TO PROVIDE A ISSUE DATE:
<br /> CONFLICT BETWEEN THE DRAWINGS AND SPECIFICATIONS AND THE CODES COMPLETE AND OPERATING SYSTEM. OVERALL CASEWORK DESIGN MANAGER:
<br /> AND ORDINANCES,THE HIGHEST STANDARD SHALL APPLY. THE COMPONENT DIMENSIONING ON PLUMBING DETAILS ARE SHOWN FOR
<br /> LESS THAN OR EQUAL TO 1 i/2"(38MM)= 1"(24MM) CONTRACTOR SHALL SATISFY CODE REQUIREMENTS AS A MINIMUM REFERENCE AND COORDINATION ONLY. LEED AP:
<br /> 2"(SIMM)OR GREATER= 1 1/2"(38MM) STANDARD WITHOUT ANY EXTRA COST TO STARBUCKS.
<br /> PROGRAM MANAGER: MP
<br /> PERMITS AND FEES 4. CONTRACTOR TO VERIFY ALL DIMENSIONS, INCLUDING CLEARANCES CHECKED BY: SR
<br /> (INSULATION VALUE=K VALUE NOT EXCEEDING 0.27 BTU"INCH(H"FT2'F) THE CONTRACTOR SHALL PROCURE AND PAY FOR ALL PERMITS, FEES,AND REQUIRED BY OTHER TRADES,AND NOTIFY STARBUCKS
<br /> SAFETY COVERS INSPECTIONS NECESSARY TO COMPLETE THE PLUMBING WORK. CONSTRUCTION MANAGER OF ANY DISCREPANCIES PRIOR TO Revision Schedule
<br /> PROCEEDING WITH THE WORK. ALL DIMENSIONS ARE TO THE FACE OF
<br /> FURNISH AND INSTALL SPECIFIED NO SCALD SAFETY COVERS WITH INSULATED WARRANTY THE FINISHED SURFACE UNLESS NOTED OTHERWISE.ALL Rev Date By Description
<br /> FOAM LINER AND TAMPER PROOF STRAP AT ALL EXPOSED ADA SINK P-TRAPS THE CONTRACTOR SHALL UNCONDITIONALLY WARRANT ALL WORK TO BE DIMENSIONS TO BE TAKEN FROM FROM ACTUAL BUILDING DIMENSIONS. 06-05-18 SS PERMIT SET
<br /> AND WATER SUPPLIES AND AS REQUIRED BY JURISDICTION . FREE OF DEFECTS IN MATERIAL AND WORKMANSHIP FOR A PERIOD OF ONE
<br /> (1)YEAR FROM THE DATE OF FINAL ACCEPTANCE BY STARBUCKS AND WILL 1
<br /> REPAIR OR REPLACE ANY DEFECTIVE WORK PROMPTLY AND WITHOUT 5. THE PLUMBING CONTRACTOR SHALL COORDINATE PLUMBING WORK
<br /> CHARGE AND RESTORE ANY OTHER EXISTING WORK DAMAGED IN THE WITH OTHER TRADES. THE ARCHITECTURAL DRAWINGS AND 2
<br /> COURSE OF REPAIRING DEFECTIVE MATERIALS AND WORKMANSHIP. SPECIFICATIONS SHALL TAKE PRECEDENCE OVER ALL OTHER 3
<br /> DRAWINGS.SEE ARCHITECTURAL DRAWINGS FOR FIXTURES IN
<br /> LEED CASEWORK AND PLUMBING DETAILS. SEE SPECIFICATION SHEETS SHEET TITLE:
<br /> ALL WORK, MATERIALS AND EQUIPMENT SHALL MEET LEED REQUIREMENTS FOR PLUMBING SPECIFICATION SECTIONS. SYMBOLS&CODE. IN CASE OF CONFLICT,THE HIGHER STANDARD SHALL APPLY. PLUMBING SYMBOLS
<br /> 6. ALL PIPING AND/OR PLUMBING DEVICES SHALL BE SUPPORTED FROM LIST & ABBREVIATIONS
<br /> STRUCTURE(NOT FROM HVAC DUCTS OR OTHER PIPES/CONDUITS). SCALE:AS SHOWN N.T.S.
<br /> T REFER TO OULTINE SPECIFICATIONS FOR PLUMBING SPECIFICATION SHEET NUMBER:
<br /> P-0001
<br />
|