Laserfiche WebLink
PLUMBING SCOPE OF WORK SUMMARY PLUMBING SUPPLY NOTES <br /> THE FOLLOWING SCOPE OF WORK IS BASED ON THE LANDLORD'S WORKLETTER � <br /> EXHIBIT C. THIS SCOPE OF WORK IS NOT INTENDED TO INDICATE THE FULL SCOPE, A SEE PLUMBING SPECIFICATIONS FOR FURTHER REQUIREMENTS. <br /> BUT ONLY A BROAD SUMMARY. THE GENERAL CONTRACTOR SHALL REFERENCE <br /> THE COMPLETE WORK LETTER FORA MORE DETAILED DESCRIPTION OF WORK BY ALL PLUMBING LINES TO BE ROUTED SUCH THAT THEY ARE NOT VISIBLE <br /> BOTH PARTIES. ANY QUESTIONS REGARDING SCOPE SHALL BE BROUGHT TO B TO CUSTOMERS,EXCEPT WHERE FIRST APPROVED BY STARBUCKS AT <br /> STARBUCKS ATTENTION FOR CLARIFICATION. RESPONSIBILITY INDICATED BELOW EXPOSED CEILING AREAS. <br /> MEANS FURNISHED,PERMITTED AND INSTALLED BY THE PARTY INDICATED C REFER TO MANUFACTURER SPECIFICATIONS FOR LOCATION OF <br /> CONNECTIONS UNLESS OTHERWISE NOTED. <br /> )o <br /> WORK DESCRIPTION Q2017 STARBUCKS COFFEE COMPANY <br /> WORK DESCRIPTIOND COORDINATE WITH ELECTRICAL CONTRACTOR FOR POWER CONNECTION <br /> LANDLORD STARBUCKS TO ALL PLUMBING EQUIPMENT. STARBUCKS COFFEE <br /> WATER SERVICE AND METER X E DIMENSIONS ARE TO FINISH FACE UNLESS OTHERWISE NOTED. <br /> BOOSTER PUMP FOR WATER SERVICE X REFER TO DETAIL SHEETS FOR PLUMBING FITTINGS LOCATED IN COMPANY <br /> BELOW FLOOR I SLAB WASTE,VENT AND WATER PIPES % F CASEWORK. 2401 UTAH AVENUE SOUTH <br /> SEATTLE, WASHINGTON 98134 <br /> ABOVE FLOOR I SLAB WASTE,VENT AND WATER PIPES % GENERAL CONTRACTOR SHALL CONTACT WATER FILTRATION SUPPLIER (206) 318-1575 <br /> PLUMBING VENTS)THROUGH ROOFX G TO COORDINATE SOW AND SCHEDULE PRIOR TO INSTALLATION OF <br /> WATER FILTRATION SYSTEM. THESE DRAWINGS AND SPECIFICATIONS ARE <br /> EXTERIOR HOSE BIBBS NIA INSULATE ALL PIPING INCLUDING PIPES AT BAR AND IN CASEWORK PER CONFIDENTIAL AND SHALL REMAIN THE SOLE <br /> BASE COVERAGE SPRINKLER SYSTEM X H THE REQUIREMENTS LISTED ON THE PLUMBING SPECIFICATION SHEET. PROPERTY OF STARBUCKS CORPORATION, <br /> WHICH IS THE OWNER OF THE COPYRIGHT IN <br /> SPRINKLER SYSTEM MODIFICATIONS FOR TENANT X THIS WORK. THEY SHALL NOT BE <br /> BUILDOUT REPRODUCED(IN WHOLE OR IN PART),SHARED <br /> SHEET NOTES WITH THIRD PARTIES OR USED IN ANY MANNER <br /> ON OTHER PROJECTS OR EXTENSIONS TO THIS <br /> PROJECT WITHOUT THE PRIOR WRITTEN <br /> CONSENT OF STARBUCKS CORPORATION. <br /> THESE DRAWINGS AND SPECIFICATIONS ARE <br /> EXTEND AS NEEDED AND CONNECTTO EXISTING CW/HW/CWFWATER INTENDED TO EXPRESS DESIGN INTENT FORA <br /> O PIPING.VERIFY IN FIELD EXACT LOCATION AND SIZE OF EXISTING PROTOTYPICAL STARBUCKS STORE(WHICH IS <br /> CONNECTED PIPING. SUBJECT TO CHANGE AT ANYTIME)AND DO <br /> NOT REFLECT ACTUAL SITE CONDITIONS. <br /> PROVIDE 1/2"CW AND 112"HW PIPES DOWN IN WALL TO HAND SINK I NEITHER PARTY SHALL HAVE ANY OBLIGATION <br /> O LAVATORY.INSTALL THERMOSTATIC MIXING VALVE AT ACCESSIBLE NOR LIABILITY TO THE OTHER(EXCEPT STATED <br /> LOCATION BELOW HAND SINK LAVATORY. ABOVE)UNTIL A WRITTEN AGREEMENT IS <br /> O PROVIDE 1-114"CW TO WATER CLOSET. FULLY EXECUTED BY BOTH PARTIES. <br /> O PROVIDE 12"CW AND 112'HW PIPES TO WORK SINK. STARBUCKS TEMPLATE VERSION 12017.05.18 <br /> OPROVIDE 12"CWF PIPE CONNECTION TO COFFEE/TEA BREWER,INSTALL <br /> SHUT-OFF IN CABINET AT 24"A.F.F.AND REDUCE TO 3/8"AT UNIT. <br /> © PROVIDE 12"CWF PIPE SUPPLY FOR ESPRESSO MACHINE.REDUCE TO <br /> 318'AT ESPRESSO MACHINE CONNECTION. <br /> OPROVIDE I2"CWF PIPE BRANCH TO SUPPLY FAUCET-HOT WATER <br /> DISPENSER GOOSNECK. <br /> O PROVIDE I2"CWF PIPE BRANCH TO SUPPLY FAUCET-WATER FILLER. <br /> O PROVIDT FOROPPIPE CONNECTION BELOW COUNTER TO METERED <br /> FAUCE10 PROVIDE1 ORATORY CONNECTION <br /> BE I <br /> OW COUNTER TO FAUCET- ACIES <br /> SINGLE a• Qapr[ssgk,4f <br /> 33TI AI <br /> 11 PROVIDE 12"CW PIPE SUPPLY FOR RINSER WITH 318"PRESS FITTING. S.hti .01., 99met54 <br /> ph:14081m,net 5 <br /> PROVIDE 12"DOUBLE CHECK VALVE BACKFLOW PREVENTER.WATTS a: 522-5260 gecP' v <br /> II4\- ILII �n SERIES 007 OR EQUAL.TO BE INSTALLED AT ACCESSIBLE LOCATIONS. inh®ades.nel <br /> V 10597 16 I '! cooregmpa zale <br /> MX-1 1 CW 13040 3 13 PROVIDE I2"CWF TO WATER TAP. <br /> O '--- �10594� 1-114"OW 1 - 14 PIPING ROUTED THRU LOW WALL. <br /> 5 17876 <br /> S 18714 REMOVE EXISTING WATER CLOSET AND REPLACE WITH NEW. <br /> EWH 15 RECONNECT NEW WATER CLOSET TO EXISTING DOMESTIC WATER <br /> \ HWS ROUGH-IN. <br /> 13040 15 O ` Cpy �""" .`J <br /> MX-1 REMOVE EXISTING LAVATORY AND REPLACE WITH NEW.RECONNECT <br /> (N)112"CW - i6 NEW LAVATORY TO EXISTING DOMESTIC WATER ROUGH-INS.INSTALL Ln <br /> *12"HW _ THERMOSTATIC MIXING VALVE AT ACCESSIBLE LOCATION BELOW <br /> 6 LAVATORY. (n LN <br /> ❑❑��� D O 112"CW TO TRAP PRIMER(PRECISION PLUMBING PRODUCTS P2500 OR Q � <br /> 17 SIMILAR).PROVIDE WALL ACCESS PANEL. LU <br /> ® T � U <br /> (J 0 10874 7 12 J,•X_ <br /> 8 10837 R E 6 12 BFP-1 06 Z <br /> BFP-1 10837 8 S 17876 0 = Q <br /> 12 7 10874 12 6 R EM S 18714 <br /> BFP-1 — BFP-1 - 14 10215 4 ❑ � / O � LIJ J,j <br /> LLI of <br /> < w0 <br /> FZ U) <br /> 10215 4 �1)3/4 CWF 0943 10 IL ILIry��ytl 0 �314"HW / U � z <br /> LU LU <br /> Oj 9 11003 1084310 II (N)314"CW 11003 9 ❑ � 0 L.L 0 Co Ix O <br /> 1 z 1 El O O D- Q D- 't LL <br /> N I <br /> ((N) 1/ CIW ((N)Y2,HW (N)112- 1 - <br /> (N) 112"HW 3 R B 5 121 <br /> (N) vz"CWF a;--(N)vr'cw <br /> " 17569 11 12 STORE #: 10183 <br /> IU <br /> r BFP-1 - j <br /> PROJECT #: 27237-038 <br /> II"�1ILl �I D 0 7 Ir3 17572 I / CASEWORK CONCEPT: <br /> ISSUE DATE: <br /> DESIGN MANAGER: <br /> / - 17564 11 12 LEED®AP: <br /> 10597 2 BFP-1 <br /> MX-1 4 10152j�J (N)1!2"HWl / PROGRAM MANAGER: MP <br /> V�II�(I Off. IypHW / CHECKED BY: SR <br /> 1 SS}JffF��}CW / <br /> ' N 2 Cw Revision Schedule <br /> 4 10215 Rev Date By Description <br /> 06-05-18 SS PERMITSET <br /> 2 <br /> 3 <br /> SHEET TITLE: <br /> Plumbing supply plan PLUMBING SUPPLY <br /> PLAN <br /> SCALE: <br /> I SCALE:AS SHOWN 1/4"= V-1)" <br /> Scale: 1/4" = 1'-0" <br /> SHEET NUMBER: <br /> P-1101 <br />