My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
1600 - Food Program
>
PR0526559
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:14 PM
Creation date
12/8/2018 3:39:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0526559
PE
1624
FACILITY_ID
FA0017977
FACILITY_NAME
STARBUCKS COFFEE #10183
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926001
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
JCastaneda
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4855\PR0526559\PLANS.PDF
QuestysFileName
PLANS
QuestysRecordDate
10/25/2018 9:36:57 PM
QuestysRecordID
3989218
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA STATE OF CALIFORNIA <br /> Electrical Power Distribution Electrical Power Distribution <br /> e£6NRCC-ELC-0I-E IRexeed OV16) CALIFORNIA ENERGY COMMISSION Z CEC.NRCC-ELCi(Revised 01116) CALIFORNIA ENERGY COMMISSION Is Ai, <br /> CERTIFICATED COMPLIANCE NRCC-ELC-01-E CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E <br /> Electrical Power Distribution Page of Electrical Power Distribution Page of _ <br /> SBUX@ARCH ROAD&HWY 99 reRaema. 06/05/2018 rnt.axow SBUX@ARCH ROAD&HWY 99 w,.mRwa. 06/05/2018 � <br /> General Information B.Separation of Electrical Circuits for Electrical Energy Monitoring <br /> ProjectAddress: Climate Zone: Conditioned Floor Area: Check all boxes below if the electrical power distribution system is in compliance with Section 130.5(6). <br /> 4895 S.STATE HWY99 EAST,FRONTAGE ROAD, IZ 17M The electrical power distribution system meets the separation of electrical circuits for electrical energy monitoring requirement of Section <br /> Unconditioned Floor Area <br /> STOCUON,CA,95215 ❑130.5(6).The electrical power distribution systems is designed so that measurement devices can monttorthe electrical energy usage of load types <br /> accordingto TABLE 130.5-B. <br /> Building Type: B Nonresidential ❑High-Rise Residential ElHutel/Motel <br /> Describe the electrical power distribution system installed and the compliance method chosen in meeting the requirement of Section 130.5(6). <br /> C POt]$TARBUCKS COFFEE COMPANY <br /> ❑Schools ❑ Relocatable Public schools ®Conditioned Spaces ❑Uncondnbned Spaces Use the space below to include the information.Examples of compliance methods are detailed in Nonresidential Compliance Manual Chapter S. <br /> Max of Construction: 0 New Construction ❑Addition ❑Alteration Fill out Column 1 thru 3 with the compliance information. STARBUCKS COFFEE <br /> General Information Electrical Power Distribution System information Electrical Service Enforcement <br /> and Method of compliance Rating Agency COMPANY <br /> In the table below Identify all applicable construction documents that specify the requirementsfor the scope 0fresponsibility,reported 01 02 03 04 2401 UTAH AVENUE SOUTH <br /> by this certificate. Use additional pages as needed to list all construction documents related to compliance Of Section 130.5. <br /> Electrical Service Describe the electrical power distribution system kVA Check that the SEATTLE, WASHINGTON 98134 <br /> Doc ument Title/Descriptions Indicate which subsection of Designation/Location/Description Installed and the compliance method used system complies (206) 318-1575 <br /> Document Number (include description information for Document Sheet#or Section 130.5 is related to the PANEL"A" EXISTING PANEL"A"THRU FEED LUGS TO PANEL"B" 96.67 <br /> Table or Schedule if it contains Page# document(e.g.130.5(a)for 120/2013PH,4W,400A 96.67KVA THESE DRAWINGS AND SPECIFICATIONS ARE <br /> compliance information) service electrical metering) <br /> CONFIDENTIAL AND SHALL REMAIN THE SOLE <br /> N/A SINGLE LINE DIAGRAM E-60G1 PANEUR" EXISTING PANEL"B"THRU FEED LUGS FROM PANEL"A" PROPERTY OF STARBUCKS CORPORATION, <br /> 120/1 3PH,4W,400A 50.29KVA WHICH IS THE OWNER OF THE COPYRIGHT IN <br /> THIS WORK. THEY SHALL NOT BE <br /> REPRODUCED(IN WHOLE OR IN PART),SHARED <br /> WITH THIRD PARTIES OR USED IN ANY MANNER <br /> A.Service Electrical Metering ON OTHER PROJECTS OR EXTENSIONS TO THIS <br /> CJwckoneofthe three boxes below I/the efe twipowerdk bu system ISMcmmlMewah Secdon13A5(o). PROJECT WITHOUT THE PRIOR WRITTEN <br /> CONSENT OF STARBUCKS CORPORATION. <br /> ❑ For newly installed electrical service in newly constructed buildings,Service Electrical Metering is required according to Section 130.5(a).Fill out ❑ THESE DRAWINGS AND SPECIFICATIONS ARE <br /> Column 1 through 6 of table below. <br /> INTENDED TO EXPRESS DESIGN INTENT FOR A <br /> ® For new or replacement electrical service equipment in existing buildings,Service Electrical Metering is required according to Section PROTOTYPICAL STARBUCKS STORE (WHICH IS <br /> 141.0(b)21pi. Fill ovt Column I through 6 of table below. SUBJECT TO CHANGE AT ANYTIME)AND DO <br /> NOT REFLECT ACTUAL SITE CONDITIONS. <br /> ❑ EXCEPTION to Electrical Service Metering:Service or feeder for which the utility company provides a metering system that indicates instantaneous NEITHER PARTY SHALL HAVE ANY OBLIGATION <br /> kW demand and kwh fora utility-defined period Fill out column 1,2 and 6 of table below with the compliance information. NOR LIABILITY TO THE OTHER(EXCEPT STATED <br /> Fill out o se orate fine foreach electrical service mot is connected or the building. I ABOVE)UNTIL A WRITTEN AGREEMENT IS <br /> Electrical Service Schedule Electrical Metering Capabilities(check all that are present) Exceptionto Field Inspector FULLY EXECUTED BY BOTH PARTIES. <br /> 01 02 03 04 05 06 07 08 <br /> STARBUCKS TEMPLATE EVERSION <br /> Tracking kWh <br /> Instantaneous Check thatthe Field Inspector Notes: <br /> Electrical Service Designation/ Historical fora kWh per Utgitymetaring <br /> Location/Description kVA (at the time) peak(kW) use period <br /> abl rate period system metering <br /> kW eperiod Complies <br /> GROUND LEVEL 96.67 ❑ ❑ ❑ ❑ ❑ ❑ <br /> ACIES ypDfE56 p4 <br /> ENGINEERING �o q <br /> 3371 Olcod Sheet <br /> Sonia Days,CA 95054 I <br /> CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 CA Building Energy Efficlency Standards-2016 Nonresidential Compliance January 2016 ph:(408)522-5255 s <br /> Is (408)522-5260 rtFCTR\CHer <br /> info@adesnm COF CAV7 <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA Copyright(D2016 <br /> Electrical Power Distribution Electrical Power Distribution <br /> CEONRC(>ELC-0bE(Remaed HAS) CAUFORNIAENERGYCOMMISSION CEGNRCPELC-0bE lssuilsd 01116) CALIFORNIA ENERGY COMMISSION <br /> ECERTIFICATEOF COMPLIANCE NRCC-ELC-01-E CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E <br /> Electrical Power Distribution Page of Electrical Power Distribution Page of <br /> Nona R.... SBUX@ARCH ROAD&HWY 99 w"Rravm 06/05/2018 "a-wir. SBUX@ARCH ROAD&HWY 99 o.ueuwrRa, 06/05/2018 <br /> C.Voltage Drop Enforcement Agen DOCUMENTATION AUTHOR'S DECIULATION STATEMENT <br /> cy <br /> Check all boxes below ljhe electrical power dlstributlon system is In Compliance with Section 330.5(c). [heck that the system 1. )certify that this Certificate of Compliance documentation is accurate and complete. toDowmen"tmn Amhm N.me t"omandinnMthmstinmre: <br /> Compiles TOMISLAV Z. GAJIC <br /> ® The electrical Power distributions tem meets the voltage requirement of Section 130.5 c.The ccmpanr. siwahes me: to <br /> as vs e p a ( I ACIES ENGINEERING 06/05/2018 W ^ <br /> maximum combined voltage drop on feeder conductors and branch circuit conductors to the farthest ❑ Addms CEA/HERS cerhoam tdemmcal(Nap ): <br /> Connected load or Outlet,do not exceed 5%. 3371 OLCOTT STREET <br /> cxr/sMu/npSANTA CLARA,CA 95054 Phil(408)522-5255 MQ <br /> 0 Voltage drop calculation documents showing Compliance to Section 1301 are submitted as part of the RESPONSIBLE PERSON'S OECIARATION STATEMENT r / 1 <br /> compliance document submittal. ❑ 1 unify the following under penalty of perjury,under the laws of the State of California: �x V <br /> 1. The Information provided on this Certificate of Compliance is true and correct. w <br /> 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified O <br /> on this Certificate of Compliance(responsible designer). Q = 0 <br /> D.Circuit Controls for 120-VDIt Receptacles and Controlled Receptacles 3. The energy features and performance specifications,materials,components,and manufactured devices for the building design or system Q W Y <br /> Field Inspector design identified on this Certificate of Compliance conform to the requirements of Title 24,Part I and Part 6 of the California Code of W <br /> Check one or more boxes belowfor applicable requirements of$Wion 1305(1 the electrical power Check that the system Regulations. r <br /> dltribudansVstem, complies � Q W O <br /> 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information Ljj <br /> ❑ provided on other applicable compliance documents,worksheet;calculations,plans and specifications submitted to the enforcement M '^ <br /> The control is capable of automatically shutting OFF the controlled receptacles when the space is typically Q V/ Q '^ <br /> agencyfore that acompletis sighed co y of application. r v' <br /> unoaupied,either at the receptacle or circuit level.For the automatic time awiUh control,it inCorporotes an Z Q <br /> 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permits)issued for the _ <br /> override control that allows the controlled receptacle to remain ON for no more than 2hours when an ❑ building,and made available to the enforcement agency for all applicable inspections,l understand that a completed signed copy of this L) f , U Z Q <br /> override is Initiated and an automatic holiday"shut-OFP feature that turns OFF all loads for at least 24 hours Certificate of Compliance is required to be Included with the documentation the builder provides to he building owner at occupancy. LU �•J W Ln O Q <br /> and then resumes the normally scheduled operation.Countdown timer switches are not be used to Comply Respommle oasuner Name Responsible oedaner signature: ( O <br /> with the automatic time switch control requirements.The controls meet the requirement of Section 130.5(d)1. TOMI$LAV Z.GAJIC O O00 <br /> wmpamACIES ENGINEERING ""'06/05/2018a- Q a- LL of <br /> ❑ There is at least one controlled receptacle within 6 It from each uncontrolled receptacle.Where receptacles El Moms:3371 ucenx: <br /> are Installed In modular furniture in open office area,at least one controlled receptacle is installed at each OLCOTT STREET E15130 <br /> worksta tion.The receptacles meet the requirement of Section 130.5(d)2. Ohnsta p'SANTA CLARA,CA 95054 Ph—(408)522-5255 STORE #: 10183 <br /> ❑ There are Installed split wired receptacles with at least one controlled and one uncontrolled receptacle. PROJECT#: 27237-036 <br /> Where receptacles are installed in modular furniture in open office area,at least one controlled receptacle is ❑ CASEWORK CONCEPT: <br /> Installed at each workstation.The receptacles meet the requirement of Section 1301 ISSUE DATE: <br /> ❑ Permanent and durable marking for controlled receptacles or circuasto differentiate them from uncontrolled ❑ DESIGN MANAGER: <br /> receptacles or circuits is provided.The markings mea the requirement of Section 1W.5(d)3. <br /> LEED®AP: <br /> ❑ For hotel and motel guestrooms,there are controlled receptaclesfor at least one-half crime 12Owft PROGRAM MANAGER: HT <br /> receptacles in each guest room.Electric circuits serving controlled receptacles In guestrooms are installed to ❑ CHECKED BY: TG <br /> have captive key controls,occupancy sensing controls,or automatic controls so the power is switched off no <br /> longer than 30 minutes after the guest room has been vacated.The receptacles inert the requirement M Revision Schedule <br /> Section 130.5 i 4. <br /> ❑ <br /> Receptacles that are only for the following purposes are excepted from Section 130.5(4): Rev Date By Description <br /> -Receptacles specifically for refrigerators and water dispensers in kitchen areas. 06-05-18 SS PERMITSET <br /> -Receptacles located a minimum of six ftabove the floor that are specifically for clacks. <br /> -Receptacles for network makers,fax machines,AN and data equipment other than personal computers in ❑ 1 <br /> copy rooms. <br /> 2 <br /> -Receptacles on circuits rated more than 20 amperes. <br /> 3 <br /> -Receptacles connected to an uninterruptible power supply(UPS)that are intended to be in continuous <br /> use,24 hours per day/365 days per year,and are marked to differentiate them from other uncontrolled SHEET TITLE: ELECTRICAL <br /> remptadesortlrcults. <br /> POWER DISTRIBUTION <br /> FORMS <br /> SCALE:AS SHOWN NITS <br /> CA Building Energy Efficiency Standards-2016 Nonresidentlal Compliance January 2016 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 <br /> SHEET NUMBER: <br /> E-0006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.