Laserfiche WebLink
NOTES ON WIRING QS LINK POWER REQUIREMENTS LUTRON SERVICES Systelm Layout <br /> CITY (MODEL <br /> TITLE <br /> OS CONTROL LINK DEVICE PDUS SERVICE DESCRIPTION General Notes <br /> THE QS CONTROL LINK HAS A FREE WIRING TOPOLOGY(DAISY CHAIN,T-TAP,ETC).THE SYSTEM WIRING (MODEL NUMBER) <br /> ILLUSTRATED BY THIS DRAWING HAS BEEN LAID OUT TO ENSURE APPROPRIATE POWER TO EACH DEVICE.IF FOR QS DEVICES THAT SUPPLY PDU THE QUANTITY OF SERVICES BELOW ARETO BE INCLUDED AS PART OF THIS PROJECTS SCOPE OF WORK AND SPECIFIED INTO THE WRITTEN SPEC 1. This layout is for System Schematic <br /> ANY REASON THE SYSTEM IS TO BE WIRED DIFFERENTLY THAN WHAT IS SHOWN,PLEASE CONFIRM ALL DEVICE DOCUMENTS purposes only.Contractor shall locate, _ <br /> POWER REQUIREMENTS ARE MET(PLEASE REFER TO'OS LINK POWER REQUIREMENTS'FOR INDIVIDUAL DEVICE DIN RAIL POWER SUPPLY +T5 PRESTARTUP$ERVICES install,and wire equipment according <br /> POWER REQUIREMENTS). MYROOM DIN RAIL POWER SUPPLY +30 ONSITE PRE-WIRE VISIT AN ONSITE VISIT WITH THE ELECTRICAL CONTAAC TOR TO DISCUSS LOGI STICAL CONSTRUCTION CONSIDERATIONS INCLUDING THE to Lutron installation and specification <br /> FOR QS CONTROL WIRE LENGTHS TOTALING LESS THAN 5001(153M).USE LUI'RON CABLE GRX-CBL-346S(4 (LSC-PREWIREI WIRING AND MOUNTING OF SYSTEM DEVICES,THE CONSTRUCTION SCHEDULE,AND LUTRON DOCUMENTATION QUANTITY DICTATES documents. <br /> CONDUCTOR NONPUENUM)OR GRXACBL-346SH CONDUCTOR PLENUM).OTH ERWISE USE 2#18 AWG(1.0 SQ MM)+ QS PLUJ POWER SUPPLY,QS J-BOX POWER SUPPLY +8 THE NUMBER OF VISITS PURCHASED. 1a. Load Interfaces(XPI,BMJ,BMF, <br /> 2#22 AWG Its SO MM)TWISTED AND SHIELDED OR EQUIVALENT(BELDEN#9461).FOR OS CONTROL WIRE LENGTHS la. <br /> ACONSULTATIVE VISIT WITH THIRD PARTY INTEGRATORS TO CONFIRM THE SPECIFIED SEQUENCE OF OPERATION AND DISCUSS <br /> TOTALING UP T02,000FT,USE GRX-CBL-48L.TOTAL OS CONTROL WIRE LENGTH MUST NOT EXCEE02,000FT(BOOM). ENERGI SAVR NODE WITH ECOSYSTEM,ENERGI SAVR NODE WITH DAU SO INTEGRATION INTEGRATION PROCEDURES NEEDED IN ORDER TO INTEGRATE WITH THE LUTRON EQUIPMENT.THIS MAY INCLUDE ANY OF THE PHPM,etc.p are shown near their <br /> CONSULTATION FOLLOWING THIRD PARTY SYSTEMS:BMS,BAS.IT.NON-LUTRON SHADES,SACHET,AV,OR ENERGY DASHBOARDS respective loads,however actual <br /> ENERGI SAVR NODE FOR 0-10 V,ENERGI SAVR NODE WITH (LSC-INT-VISIT) installation location can vary. <br /> SOFTSWITCH,ENERGI SAVR NODE FOR 0-10 V(DIN RAIL),ENERGI +14 ry' <br /> SENSOR LAYOUT& LUTRON WILL TAKE RESPONSIBILITY FOR LUTRON PROVIDED SENSOR PLACEMENT AND PERFORMANCE BY CREATING SENSOR <br /> NOTES FOR LED APPLICATIONS SAVRNODEWITHSOFSWITCH(DINRAIL) TUNING LAYOUTS AND COORDINATIn, nrNgOP PI A'E VP1 JT El FOR I A N D AUER INSTALLATION.ONCE THE BUILDING IS OCCUPIED,LUTRON 1b.If the LUtronSensor Layout aEd <br /> ENERGI SAVR NODE PHASE ADAPTIVE(DIN FALL 1 A MYROOM ON (LSC-SENSLT) WILL RETURN UP TO TW - - '�"ING. tuning service has been purchased, ©eon sTnxaucxs coFFEE coMPnxv <br /> FOR ANY FORWARDIREVERSE PHASE,3-WIRE,O.IO V AND SWITCHING LED DRIVERS,PLEASE VERIFY THE NUMBER RAIL POWER MODULE SWITCHING,I A MYROOM DIN RAIL POWER N <br /> MODULE PHASE STARTUP SUPPORT SERVICES than daylight and occupancy <br /> DRIVERS SUPPORTED ON EACH DEVICE.FOR MORE INFORMATION,PLEASE VISIT LUTRON'S LED CENTER OF ENERGI SAVRVR NODE ADAPTIVE AVE +3 DE WITH DALI(DIN RAIL),ENERGI SAVR NODE WITH RHESE6EAMICEBME AoflrtloxAL To YOUR SPECIFIED sinRTua 6ns6o ON YOUR AEWplaced sensors are laced by Lutron. STARBUCKS COFFEE <br /> EXCELLENCE(WWW.LUTRON.COWUEDS). ECOSYSTEM(DIN RAIL) AFTER HOURS STARTUP STARTUP PROVIDED BETWEEN THE HOURS OF 5911PM� . .ONDAY-FRIDAY.THIS SCOPE OF WORK DOES NOT INCLUDE 2. See Cover Sheet and One-Lines for COMPANY <br /> CS MOTOR GROUP CCNTROLLER(DIN RAIL),HOMEWOWS QS DIN 0 (LSC-AH-SUI HOLIDAY OR WEEKEND WORK.ADDITIONAL FEES MAY ALI �R WORK TO BE COMPLETED ON WEEKENDS(FRIDAY 5AJ0PM- additional information. <br /> RAIL POWER MODULES MONDAY 7001 2401 UTAH AVENUE SOUTH <br /> GRAFIK EYE CS(ALL MODELS EXCEPT GRARK EYE OS DAU WITH KNXIONSITE SCENE&LEVEL AN ONSITE VISIT WITH THE SPECIFIER OR CUSTOMER REPRESENTATIVE TO REVIEW THE DESIGN INTENT.FINE-TUNE THE SCENE <br /> QSTIMECLOCK +8 TUNING LEVEL PROGRAMMING.AND MAKE ADJUSTMENTS TOTIMECLOCKS, Legend SEATTLE, WASHINGTON 98134 <br /> LINK A:0 (LSC-AF-VISIT) 206 318-1575 <br /> On QUANTUM LIGHTING HUB LINKS SQD:+33 EACH ONSITE AN ONSITE WALKTHROUGH WITH FACILITY REPRESENTATIVES OR PROJECT COMMISSIONING AGENTS TO DEMONSTRATE THAT THE QSN-4Ti6-S(1) <br /> PERFORMANCE-VERIFIC SYSTEM FUNCTIONALITY MEETSTHE DESIGN INTENT.THISMAYINCLUDEANYOFTHEFOLLOWINGONSITEACTIVITIES- <br /> oP3QUANTUMLIGHTINGHUB LINKS ALB:+33 EACH ATION WALKTHROUGH CONSULTATIONR WING DEMOS.FUNCTIONAL TESTING ASSISTANCE.OR INVENTORY OF LUTRON EQUIPMENT. QSM2-4W-C(2) THESE DRAWINGS AND SPECIFICATIONS ARE <br /> (LSC-WALK) CONFIDENTIAL AND SHALL REMAIN THE SOLE <br /> QS DEVICES THAT CONSUME PDU SYSTEM COMPLETION OF DOCUMENTATION WHICH PROVIDES PERFORMANCE VERIFICATION CERTIFYING THE LUTRON EQUIPMENT HAS BEEN PJ2-2B-GWH-LO1 (CW-1-WH) PROPERTY OF STARBUCKS CORPORATION, <br /> CS WALLSTATION(SEETOUCH,ARCHITRAVE,SIGNATURE SERIES,CIS PERFORMANCE-VERIFIC THOROUGHLY TESTED.IT SUPPORTS THE DOCUMENTATION REQUIREMENTS OF MANY BUILDING STANDARDS. �I (3) WHICH IS THE OWNER OF THE COPYRIGHT IN <br /> PICO.KEYSWTTCH,SINGLE COLUMN PALLADIOM),QS SLIDER,GRAF8I T -1 ATION DOCUMENTATION PJ2-2BRIL-GWH-L01 (CW-1-WH) THIS WORK. THEY SHALL NOT BE <br /> SLIDER.QS INFRARED (LS <br /> IR)EYE,WALLBOX INPUT CLOSURE INTERFACE (LSC -DOC) <br /> ( (10) REPRODUCED(IN WHOLE OR IN PART),SHARED <br /> TITLE 24 ACCEPTANCE ACCEPTANCE TESTING BYALUTRON CERTIFIED LIGHTING CONTROL ACCEPTANCE TEST TECHNICIAN(CLCATT)TO FULFILL THE <br /> PROGRAMMING RK <br /> INTERFACE. <br /> .DO WADMX NTERFACE,ENEBLERGI COLUMNSAVR <br /> TEST VISIT REQUIRED TITLE 24 INTERIOR LIGHTING CONTROL TESTS. QSGRJ-3P-WH 1 WITH H THIRD PARTIES OR USED IN ANY MANNER <br /> PROGRAMMING INTERFACE,QS WALLSTATION(DOUBLE COLUMN -2 (LSC-BPV-DOGT24) d` ( ) ON OTHER PROJECTS T EXTENSIONSTETHIS <br /> CISSENP�JJLADOR a. PROJECT OF STA TTHEPRIORWRITTEN <br /> QS SENSOR MODULE(QSM),NOT INCLUDING ATTACHED WIRED POST-STARTUP SERVICES QE QSGRJ-6P-WH(1) CONSENT OF STARBUCKS CORPORATION. <br /> SENSORS(SEE SECTION BELOW FOR MORE INFORMATION),OS S CUSTOMER-SITE AVISIT TO TEACH SYSTEM USERS HOW TO OPERATE AND MAINTAIN THE LIGHTING CONTROL SYSTEM. THESE DRAWINGS AND SPECIFICATIONS ARE <br /> CONTACT CLOSURE INTERFACE,PALLADIOM ROOM THERMOSTAT CUSTOMER-SIM <br /> Q� LRF2-DC'RB-WH(2) <br /> SOLUION TRAININTFAINING �. INTENDED TO EXPRESS DESIGN INTENT FOR A <br /> GUESTROOM CONTROL UNIT S T <br /> SYSTEM OPTIMIZATION AN ONSITE CONSULTATIVE VISIT TO IDENTIFY AND IMPLEMENT LIGHTING CONTROL ADJUSTMENTS TO SAVE ADDITIONAL ENERGY LRF2-OCR2B-P(4) PROTOTYPICAL ANYTIME) <br /> (WHICH IS <br /> SENSORS&DEVICES THAT CONSUME PDUS WHEN WIRED TO A OSM (LSGSYSOPLSPI AND CREATE A MORE PRODUCTIVE WORK ENVIRONMENT. �� SUBJECT TO CHANGE AT ANYTIME)AND DO <br /> AAl1 PHPM-PA-120-WH(8) NOT REFLECT ACTUAL SITE CONDITIONS. <br /> LIJ <br /> LUTRON DAYLIGHT SENSOR, TRON INFRARED(IR)RECEIVER,PLCO o5 MAINTENANCE III,SUPPORT SERVICES W1 NEITHER PARTY SHALL HAVE ANY OBLIGATION <br /> WIRED CONTRMLER NOR LIABILITY TO THE OTHER(EXCEPT STATED <br /> COMMERCIALSYSTEMSEMS FIRSTARSYSTEM WARRANTY PROVIDING 100%REPLACEMENT PARTS AND 100%LUTRON DIAGNOSTIC LABOR COVERAGE WITH PHPMSIN-DV-WH(1) ABOVE)UNTIL A WRITTEN AGREEMENT IS <br /> ECOSYSTEM WALLSTATION -1 WARRALIMITED FIRST-AVAILABLE RESPONSE TIME. <br /> WARRANTY 1 AEJ QSE-CI-AP-D FULLY EXECUTED BY BOTH PARTIES. <br /> LOS CSERIES OCCUPANCY SENSOR,HIGH DAY OCCUPANCY SENSOR -2 (LC-B2)S ( ) <br /> ENHANCED SILVER YEARS i-2.100%REPLACEMENT PARTS AND 100%LUTRON DIAGNOSTIC LABOR COVERAGE WITH A FIRST-AVAII-I RESPONSE 1 <br /> (LSGESS) TIME;YEARS 3.5.50%PARTS ONLY COVERAGE;YEARS 6.8.25%PARTS ONLY COVERAGE. 11 MRF2S-EIANS120-WH(2) STARBUCKS TEMPLATE VERSION 2017.05.18 <br /> ENHANCED GOLD YEARS 1-2-100%REPLACEMENT PARTS AND 100%LUTRON DIAGNOSTIC LABOR COVERAGE WITH A 72-HOUR RESPONSE TIME AND <br /> (LSC-E8G) AN ANNUAL N-DAY)SCHEDULED PREVENTIVE MAINTENANCE VISIT;YEARS 3.5-50%PARTS ONLY COVERAGE:YEARS 25%PARTS ©I] C-ESN-SETUP(1) <br /> ONLY COVERAGE. <br /> ENHANCED PLATINUM YEARS I-2.100%REPLACEMENT PARTS AND 100%LUTRON DIAGNOSTIC LABOR COVERAGE WITH A24-HOUR RESPONSE TIME AND <br /> (LSPE8P) AN ANNUAL(I-DAY)SCHEDULED PREVENTIVE MAINTENANCE VISIT;YEARS M-50%PARTS ONLY COVERAGE:YEARS 25%PARTS <br /> ONLY COVERAGE. <br /> SAVERTECHNOLOGY AN ANNUAL SERVICE PLAN THAT COVERS 100%REPLACEMENT PARTS AND 100%LUTRON DIAGNOSTIC LABOR WITH <br /> SUPPORT PLAN FIRST-AVAILABLE ONSITE OR REMOTE RESPONSE TIME. <br /> (1SOSILV-IW) <br /> GOLDTECHNOLOGY AN ANNUAL SERVICE PLAN THAT COVERS 100%REPLACEMENT PARTS AND 100%LUTRON LABOR WITH A 72-HOUR ONSITE OR <br /> SUPPORT PLAN REMOTE RESPONSE TIME.ALSO INCLUDES AN ANNUAL(I-DAY)SCHEDULED PREVENTIVE MAINTENANCE VISIT EACH YEAR. <br /> (LSC-GOI_GIW) <br /> PLATINUM AN ANNUAL SERVICE PLAN THAT COVERS 100%RE PLACEMENT PARTS AND 100%LUTRON DIAGNOSTIC LABOR WITH A 24-HOUR <br /> TECHNOLOGY SUPPORT ONSITE OR REMOTE RESPONSE TIME.ALSO INCLUDES AN ANNUAL fl-DAY)SCHEDULED PREVENTIVE MAINTENANCE VISIT EACH <br /> PLAN YEAR. A111175PREVENTIVE) SCHEDULED MAINTENANCE VISIT TO PERFORM PREVENTIVE MAINTENANCE,MINOR PROGRAMMING.AND CONDUCT SYSTEM h¢W�S1J`v ZGe4fyc <br /> MAINTENANCE VISITS) TRAININGS.OUANTITY IS IN ADDITION TO ANY YEARLY VISITS SPECIFIED WITH AN ENHANCED WARRANTY OR TECHNOLOGYSUPPORT ENGINEERING <br /> (LSCSCH-MAINT) I PLAN. <br /> 337101000 Skeet <br /> PLEASE GO TO W .LUTRON.COM/SERVICES FOR FURTHER INFORMATION. Santa Clara,CA 95954 <br /> WW <br /> ph:(4081522-5255 �B i <br /> IS (408)522-5260 �cFC1RWHQr <br /> infe&dn"at FOF CAVI <br /> Co,rghUD2016 <br /> LO <br /> N <br /> IIpII IIpII > W LO <br /> (N)RESTROON CEILING (N)VESTIBULE CEILING (N)RESTROON CEILING <br /> GYP BD. GYPBD GYP.BD. <br /> @9-O'AFF. III 9'-O'AFF. @9'-0'A F.F. <br /> 06 <br /> WXXX%-ES WXXI(X-ES Wx%XX-ES ExTERioR <br /> SIGN 0 2 <br /> O <br /> V Vt S>— (N)CAFE BULKHEAD u) F U <br /> a <h w h w h 'm h mn h w a hE ( GYP BD. O W a w <br /> 11J IY O <br /> 05 N <br /> 116593 6593 ` ` <br /> 1 t 19023 L 190 Y19023 © � tt9H6 > c - W%XX%-ES Z Q V/ i/1 <br /> • • '19116' L 19116 a v� <br /> &2a 3-21 oRESTROOMt9116 19116 ID. EM - '^ <br /> yrSi L 191 BERTROOM2 A a h � h (A <br /> 1 %1911 003.e - 919116 L) U /) <br /> ® [NJ <br /> 6-6 (N)CAFE CEILING '� <br /> '1605] 15057 EXE%1 L to 16593 t19fl8 1 6 / 5 ACT TILE Project Name: O O <br /> _ 7) I/ Loa I T-D A.F.F. Starbucks#10183-Arch Road&Hwy 99- X QQ O <br /> 7 „v,. ' wxxxx-Es Stockton,CA d d � V- of <br /> PANEL'A' Q �,,,��� -" oafl6 <br /> 4 1 ,I: ' ' - Location: <br /> �PANEL'B' 4'� - , � ,_ � ', , STORE #: 10183 <br /> a D-sI )(E) <br /> Stockton,California <br /> 6 19002 n o1 ..6 a E 18116 ^. 191% 1 19116 r Ii%00302 <br /> 3-fik . Bhp-e--e- -e `F_ PROJECT#: 27237-038 <br /> (E)CAFE CEILING Project Number <br /> &2a • - es,9n6 <br /> ACT o LLFF, 2101029.0 CASEWORK CONCEPT: <br /> wo _ @ ISSUE DATE: <br /> O • 3 3 3 3 a 'y i s Created by: <br /> •15857 19141 ,9n6 19116 ,9H6 tn16 _ ,9„< n 919116 6 wxxxx-E5 DESIGN MANAGER: <br /> LI�e �m — I,i6 Robert Tirado <br /> CAFIEi9gft AREq <br /> 3 I. ill 231 Pc LEED®AP: <br /> F - �� File Name: PROGRAM MANAGER: HT <br /> _ r OD-2101029-Starbucks#10183- Arch Road CHECKED BY: TG <br /> _ �� � nYLe�XG <br /> hx z— 2 (N)ENGINES <br /> OFFIT <br /> • 19118'. 0,9116 tl,911f� 0,9116 yt9H6 0,9116�J 19H6 18116 18116 S S 5 ACT TILE TO & Hwy 99-Stockton,CA_05.24.18.lutd <br /> 1919116 C,9H6 919116 MATCH(E) <br /> I <br /> �� � ��_ I @ e 1-1Iz-APF Revision Schedule <br /> I. c939� Document Revision: <br /> 5-� w%xxx-ES <br /> IS a NOTE: Rev Date By Description <br /> 2 / (26 L 190 X00303 x00303 x00303 <br /> 0 ' 19116 �� a119n6 r--0d 4a�1 4 0119116 0319116 �x191161i 19n6 ;)L 191 IM16 1911 'Bw s B THE PRESENTED LUTRON DIMMING CONTROLS Date: May 24, 2018 O6-OS18 SS PERMIT SET <br /> i 15057 J (E)ENGINE SOFFIT <br /> \�� ^_ 91119 v,9H6 c 11,6 DIAGRAM IS FOR REFERENCE ONLY aaaaaaaaaaaam <br /> ncr TILE ELECTRICAL CONTRACTOR TO INCLUDE IN 1 <br /> L tdd09 -� @91- 1/2-ArF <br /> BID FULL COORDINATION WITH LUTRON ON RCP 2 <br /> `144691 6-2c 118119 tans19116 19116 � �� BwzxxxES PROVIDING DETAILED DIAGRAM AS WELL AS 3 <br /> 3(E) DETAILED BOM.ELECTRICAL CONTRACTOR <br /> INCLUDE IN BID ALL ADDITIONAL PARTS AND I NOT FOR CONSTRUCTION SHEET TITLE: <br /> ACCESSORIES REQUIRED FOR COMPLETE AND LUTRON <br /> OPERABLESYSTEM. <br /> 43,99„-6� 9„6 `ESO E� LUTRON CONTACT IS: CONTROL DIAGRAM <br /> Kevin Smith <br /> Andy Groeninger %m'LUTFtON. <br /> SCALE:AS SHOWN N.T.S. <br /> v vLutron Electronics Lutron Electronics Co.,Inc. <br /> IEI� (EI Lutron Electronics 7200 Suter Road _7 <br /> 5)3.913. ectr 206.902.7323 SHEET NUMBER: <br /> s sbrbuda@lut n.com k9mI�Otron.CO- Coopersburg,PA 18036,USA <br /> +1.610.282.3800 Fax: +1.610.282.1146 E-6004 <br />