Laserfiche WebLink
four (4) inches and a minimum radius of three-eighths (3/8) of an inch provided. CURFFL <br /> 114150 <br /> 5) Provide an adequate supply of hot water to meet the peak demands of all fixtures utilizing <br /> hot water. CURFFL 114095 Minimum 9 KW required. <br /> 6) Hood must be constructed to meet the requirements of the Uniform Mechanical Code and <br /> NSF Standard 2• <br /> the construction progress. pen with all equipment <br /> An inspection must be <br /> You must keep this office informed of <br /> scheduled at least 48 hours in advance when the facility is ready to open <br /> installed and thorough cleaning completed. A fee of$89.00 per hour may be accessed for any <br /> additional inspections,re-inspections or consultations. <br /> Any item(s) inadvertently overlooked in the plan check process,which is not in compliance with <br /> applicable County Codes and/or State Laws, shall be constructed or reconstructed upon request <br /> of the Environmental Health Department. Inferior workmanship, equipment, or materials will <br /> not be accepted for the construction or operation of a food facility. Any variance from the <br /> requirements outlined in this letter will require written approval from this Department. <br /> Approval of the submitted plans shall become null and void if the work authorized is not <br /> commenced within 180 days from the date of approval, or the work authorized by such plans is <br /> abandoned. In order to renew action on an expired plan approval, the applicant shall submit fees <br /> equal to that of a new plan review. A copy of approved plans shall be available on site at the <br /> time of final inspection. <br /> If you have any questions related to this plan check approval letter,please contact Vidal Pedraza, <br /> Senior R.E.H.S.,at(209)468-0334. <br /> Donna Heran, R.E.H.S.,RI <br /> for <br /> Environmental Health s• n <br /> Mark Ba <br /> Supervisor R.E.H.S. <br /> Reference guide fm Plnek95 -2- (Rev 6/18/98) <br />