My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SPRECKELS
>
127
>
1600 - Food Program
>
PR0521864
>
COMPLIANCE INFO_2011-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 2:07:47 PM
Creation date
12/9/2018 2:17:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2019
RECORD_ID
PR0521864
PE
1624
FACILITY_ID
FA0014851
FACILITY_NAME
DELI DELICIOUS
STREET_NUMBER
127
STREET_NAME
SPRECKELS
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120035
CURRENT_STATUS
01
SITE_LOCATION
127 SPRECKELS AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
JCastaneda
Supplemental fields
FilePath
\MIGRATIONS\S\SPRECKLES\127\PR0521864\COMPLIANCE.PDF
QuestysFileName
COMPLIANCE
QuestysRecordDate
6/15/2015 6:10:21 PM
QuestysRecordID
2747509
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION PLAN APPROVAL PROCEDURES for FOOD <br /> FACILITIES <br /> Pursuant to the California Health & Safety Code, Chapter 4, California Uniform Retail Food Facilities Law <br /> (CURFFL), Section113915, a plan approval must be obtained from the San Joaquin County-Environmental <br /> Health Department (SJC-EHD) before constructing or remodeling any building for use as a food facility. <br /> Remodel of a food facility means construction, building, enlarging, altering, converting or repairing that <br /> requires a permit from the local building authority. The following procedures are required to process and <br /> approve food facility plans as well as to obtain final approval to open for business: <br /> 1. The plans must include sufficient information to demonstrate compliance with the "Minimum <br /> Requirements for Food Facility Plans." (See page 7) <br /> 2. Plans may be prepared by an architect,draftsman,designer,contractor or owner. All plans must be <br /> drawn in a concise, detailed and professional manner. Inadequate plans will be rejected. <br /> 3. A minimum of three (3) sets of detailed plans and specifications must be submitted, a food <br /> construction plan application form completed and required plan check fees of $267.00 (3 hour <br /> minimum). All overtime review shall be charged the hourly rate calculated atone and one half times, <br /> with a one hour minimum ($133.50 per hour). <br /> 4. Upon approval,two (2) sets of plans are to be submitted to the building department,and the third set <br /> will be kept on file by EHD until construction has been completed. An approved set of plans must be <br /> maintained at the construction site until the final inspection has been made. <br /> 5. Before commencing construction, approvals must be obtained from EHD, local building authority <br /> and other appropriate agencies. Building permits for food facilities are not to be issued until plan <br /> approval has been obtained from the local health department. <br /> 6. If any changes on the approved plans are desired, revised plans shall be submitted for review and <br /> approval prior to construction. Additional fees shall be required for review of revised plans at a <br /> charge of $89.00 per hour (one-hour minimum). <br /> 7. All construction and equipment installation shall be subject to a field inspection. The food facility <br /> shall not open for business until final approval is obtained from the Environmental Health <br /> Department and a valid Health Permit is issued. Call (209) 468-3420 for inspections or <br /> appointment(s). <br /> 8. Approval of the plans shall become null and void if the work authorized is not commenced within 180 <br /> days from the date of approval, or if the work authorized by such plans is abandoned. In order to <br /> renew action on a permit after expiration, the permittee will pay a new full plan check fee. <br /> 4 <br /> EHD 16-01-001 <br /> REVISED 02-21-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.