Laserfiche WebLink
% <br /> S WRCB,January 2002 <br /> Page 69 of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer ❑Indus Standard d ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ressure <br /> ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment a,a e tV�� <br /> q pment Used ''�"e 4 <br /> Equipment Resolution: <br /> �gdlaAa�ir <br /> I Piping Material: <br /> i�A �^�� �r�k�r <br /> 1•,�,���vy. Piping Run�# i in Run# <br /> p g iping Run# iping Run# <br /> 1 � <br /> Piping Manufacturer: /I <br /> Piping Diameter: <br /> Length of Piping Run: <br /> oXr SO <br /> Product Stored: ' <br /> �IPse- f, <br /> Method and location of r'eb �} a GCc <br /> piping-ran isolation: I M ^ a 5 ly F! <br /> W ' time between applying <br /> ressur /vacuum/water and <br /> S ing test: h.9G�r <br /> Test Start Time: y <br /> Initial Reading(Rj): 5 P <br /> Test End Time: <br /> lo , � v � <br /> Final Reading(RF): <br /> Test Duration: <br /> rf <br /> Change in Reading(RF-RI): S S <br /> Pass/Fail Threshold or <br /> Criteria: Ivo ICJJ i � <br /> Test Result: Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> CO menu—(include information on repairs made prior totesting_and recommended follow up for failed tests) <br /> A!n q 0 �i �r LxC K t j jof,, `t S G+e c p <br />