Laserfiche WebLink
State Water Resources Control Board <br />https://www.waterboards.ca.gov/ust/leak_prevention/lg 113/vendor... <br />Home -a List » Leak Prevention -s Lg113 a Vendors <br />USTProgram - LG u. ..... ... _ .. ......... . ...... ........ ...... . .. _........ ...... .......... <br />Issue Date:aeptember 14, 2018 <br />CGRS. Inc. <br />iotaVision- L005 <br />Enhanced Leak Detection (ELD) Method <br />NON -VOLUMETRIC TANK TIGHTNESS TEST METHOD (TRACER) <br />Certification Leak rate of 0.005 gph as vapor with PD = 100% and PFA = 0%. <br />Leak <br />Threshold A tank system should not be declared tight when brine is observed in the primary containment. <br />Applicability Method tests the primary containment of newly installed secondarily contained tanks. It does not test single-wall, portions of the tank that are not exposed to the brine solution such as tank bungs and manway penetrations. <br />The primary component of the system under test must be dry, containing no liquid, except that it may contain up to 1 Inch of residual ballast water if a dyed brine solution is used. The interstice must be liquid filled. <br />Tank Not limited by capacity. <br />Capacity <br />Test Period Following the pre-test wailing time, normal test duration operationally In the field is 1 minute for each 5 feet of leak point target area (up to 4 feet wide), and is less than 60 minutes for most containers. The test duration can <br />vary depending on the condition of the tank surface. lithe tank surface Is clean and free of any water, the test duration could be shorter. lithe Inside of the tank is dirty, contains some gravel and has up to 1 inch of ballast <br />water, it is possible that the test duration would be longer. The assessment of the tank condition is determined by the trained technician that is operating the iotal7tsion- method. Once the tank condition Is determined, an <br />appropriate test duration is implemented. <br />Walting Time After the brine level is raised to a minimum of 3Inches above the primary tank, a minimum 30 minutes of pre-test waiting time to allow brine solution to collect In the low point of the tank where it may be visually observed. <br />Dosage The interstice must be completely filled with colored or dear brine. <br />Sampling <br />Points Tank top access must be sufficient to allow the entry of the remote observation vehicle. <br />Groundwater Groundwater level is not determined and does not impact the test. <br />Detector Colored or colorless brine Is observed visually via a remote Inspection vehicle Inserted Into the tank. <br />Calibration Not applicable. <br />Comments This method allows for the detecting of the clear brine solution or a dyed brine solution Ingress Into the primary space of a double walled tank at any point that can be observed. When a dyed <br />brine that has a contrasting color, when compared to the tank surface, Is used to BII the Interstice, there can be up to 1 Inch of water present at the bottom of the tank at the beginning of the <br />pre-soak test period. This method Is mainly used to test newly Installed double walled tanks that have an Interstitial space that Is filled with a colored brine solution. These newly Installed tanks <br />do not have product present Inside the primary area of the tank. CGRS prohibits the use of this test method in a tank that has contained petroleum product at any time without specific written <br />approval from the CGRS director of health and safety. <br />As referenced by the California Water Resources Control Board technical letter Enhanced Leak Detection Testing for Hydrostatically Filled Underground Storage Tanks, dated <br />September 14, 2018. <br />CGRS, Inc. Evaluator: Ken Wilcox Associates <br />1301 Academy Court Tel: (816) 443-2494 <br />Fort Collins, CO 80524 Date of Evaluation: 08/17/17 <br />Tel: (800) 288-2657 <br />E-mail: ehick®cars.com <br />URL: www.CGRS.com <br />I Horilg I Vendors: A- F I Vendors, G- M I Vendors: N- 5 1 Vendors- T- Z I Method Index I <br />Appearance on this list is not to be construed as an endorsement by any regulatory agency nor is it any guarantee of the performance of the method or equipment. <br />Equipment should be installed and operated in accordance with all applicable laws and regulations. <br />For full details, please refer to our expanded "DISCLAIMER" page. <br />Conditions .'Use I N—i Pnlby <br />Copyright m 2018 State of California <br />The California Water Boards include the Stale water Reeouroes Control Board and nine Regiorml Boards <br />The State Water Board is one of six environmental entities operating under <br />the authority of the CalRomia En iromnental Protection Agency <br />CaVEPA I ARB I CalRecycb l DPR I DTSC I OEHHAI SaIRCIS <br />1 of 1 11/6/2018, 11:41 AM <br />