My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1245
>
2300 - Underground Storage Tank Program
>
PR0541906
>
INSTALL_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 4:03:26 PM
Creation date
12/13/2018 4:57:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0541906
PE
2351
FACILITY_ID
FA0024040
FACILITY_NAME
MANTECA CHEVRON
STREET_NUMBER
1245
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1245 N MAIN ST
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
621
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elena K. Manzo [EH] <br />From: Glenn <glenn@btssc.com> <br />Sent: Thursday, November 8, 2018 5:00 PM <br />To: Elena K. Manzo [EH]; 'Rupinder dhillon' <br />Cc: 'Paul Raj' <br />Subject: RE: 1231 N main Street <br />I have updated the plans to show the vacuum communication testing using hoses and ball valves to each test port <br />penetrations. They will be with the owner for your meeting tomorrow. <br />Thank you, <br />Glenn Paredes <br />B&T Service Station Contractors <br />CSLB #902034 <br />A, B, C -61/D-40, Hazmat Certification <br />(805) 929-8944 Ext 1002 <br />From: Elena K. Manzo [EH] [mailto:emanzo@sjcehd.com] <br />Sent: Tuesday, November 06, 2018 11:05 AM <br />To: Rupinder dhillon <br />Cc: Glenn; Paul Raj <br />Subject: RE: 1231 N main Street <br />Hi Glenn <br />I am looking over your revised plan received on 10-15-2018 (attached) and it appears that a port will be installed on a <br />manometer line of brine UDC monitoring hose, that's not necessary on that line, since it will not be useful for vacuum <br />communication testing. What I was looking for instead are some means (a valve, etc.) to routinely test vacuum <br />communication of piping interstitial at each UDC piping termination, for example 87, 91, diesel and vapor recovery <br />piping in each given UDC . Also, it looks like your penetrations will have bolts, please clarify if you are proposing to install <br />different, not Bravo (which don't' have bolts), penetrations? Please see the attached drawing for your reference. <br />Elena <br />From: Elena K. Manzo [EH] <br />Sent: Tuesday, November 6, 2018 10:29 AM <br />To:'Rupinder dhillon' <todhillon@yahoo.com> <br />Cc: Glenn <glenn@btssc.com>; Paul Raj <chadhaconstruction@live.com> <br />Subject: RE: 1231 N main Street <br />Hi Rupinder <br />Are you and your contractor able to meet at our office on October 9th at 1:30 pm? <br />Sincerely <br />Elena <br />From: Rupinder dhillon <todhillon@yahoo.com> <br />Sent: Friday, November 2, 2018 8:20 AM <br />To: Elena K. Manzo [EH] <emanzo@slcehd.com> <br />Cc: Glenn <glenn@btssc.com>; Paul Raj <chadhaconstruction@live.com>; Raj Dhillon <todhillon@vahoo.com> <br />Subject: Re: 1231 N main Street <br />
The URL can be used to link to this page
Your browser does not support the video tag.