Laserfiche WebLink
Stacy Rivera [EH] <br />From: <br />Elena K. Manzo [EH] <br />Sent: <br />Monday, October 15, 2018 9:23 AM <br />To: <br />Stacy Rivera [EH] <br />Cc: <br />Glenn <br />Subject: FW: 1231 N main Street <br />Attachments: 71 SO.PDF; Chevron Manteca - TL2.pdf; Chevron Manteca - TL1.pdf; 1231 North Main <br />Street - UST Install - B&T Service Station Contractors 10-11 Signed.pdf <br />Hi Glenn <br />I am forwarding your emails to Stacy Rivera (cc ed on this email), I will be out of the office in training for the next two <br />weeks, please direct all the questions and any additional information you need to submit to her. <br />Sincerely <br />Elena <br />-----Original Message ----- <br />From: Glenn <glenn@btssc.com> <br />Sent: Friday, October 12, 2018 2:01 PM <br />To: Elena K. Manzo [EH] <emanzo@sjcehd.com>; construction@btssc.com <br />Cc: 'Raj Dhillon' <todhillon@yahoo.com>; 'Paul Raj' <chadhaconstruction@live.com>; 'Raj Dhillon' <br /><todhillon@yahoo.com> <br />Subject: RE: 1231 N main Street <br />Elena, <br />I have attached plans with changes made based off of your comments from this email and 10-11. As well as the updated <br />application. <br />1. 1 have checked all boxes that apply on the application. <br />2. Tank size on the equipment list sheet TI -7 states the tanks are 10'. 1 am confirming tank sizes are 10' diameter. On <br />page 8 of 8 the overfill valve is listed as 7150-420C. That model is used for 12' Tanks or smaller. <br />Since the tanks are 10' this part is correct to use on 10' tanks. The overfill valves are fitted in the field. The final step to <br />installing them is to cut them at 45 degrees 5" above the tank bottom. I have attached the cut sheet for that part as <br />well. <br />3. Bravo penetrations will be used on all tank, dispenser and vent sumps. <br />The cut sheet on Sheet TI -2 showing NOV penetrations has been crossed out as we will not be using NOV penetrations. <br />I will be responding to your email from 10/11 with corrections to your comments shortly. <br />Please let me know if you need anything else or have any more questions prior to your approval. <br />Thank you, <br />Glenn Paredes <br />B&T Service Station Contractors <br />CSLB #902034 <br />A, B, C -61/D-40, Hazmat Certification <br />