Laserfiche WebLink
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />SERVICE <br />SERVICE <br />Inspection Date: <br />uigtecapill <br />t <br />❑ <br />5-[ ► �i <br />Facility Address: <br />mechanical <br />Model: <br />Service Request #: <br />Onsite Service Technician's Name: <br />electronic <br />ICC Service Technician/Installer Expiate: <br />Manufacturer Training: <br />Cs r r <br />y 0 I c� <br />❑ Caldwell System ❑ Other <br />Leak detector <br />❑ <br />❑ <br />❑ This UST facility is APPROVED to operate <br />SERVICE <br />SERVICE <br />Spill bucket ❑ minimum <br />Leak detector <br />❑ <br />❑ <br />❑ <br />mechanical <br />Model: <br />❑ <br />electronic <br />Serial #: <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ line test programmed <br />❑ Caldwell System ❑ Other <br />Leak detector <br />❑ <br />❑ <br />mechanical <br />Model: <br />❑ <br />electronic <br />Serial #: <br />Secondary containment testing for: <br />❑ line test programmed <br />UDC(s) <br />sensor <br />❑ <br />❑ <br />positive shutdown <br />Model: <br />next due by: <br />❑ <br />fail safe <br />Serial #: <br />i <br />❑ <br />NA <br />❑ <br />Cold start of monitoring panel <br />THIS FACILITY IS <br />sensor <br />Corrosion protection <br />❑ <br />❑ <br />positive shutdown <br />Model: <br />❑ <br />fail safe <br />Serial #: <br />❑ <br />NA <br />sensor <br />❑ <br />❑ <br />positive shutdown <br />Model: <br />❑ <br />fail safe <br />Serial #: <br />❑ <br />NA <br />❑ <br />Drop tube with <br />mechanical overfill at 95% <br />❑ <br />Drop tube with <br />mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />❑ This UST facility is APPROVED to operate <br />This UST facility is NOT APPROVED to operate <br />SERVICE <br />Spill bucket ❑ minimum <br />5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum <br />5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />dALM M11" <br />Secondary containment testing for: <br />UDC(s) <br />Piping <br />Sump(s) <br />UST(s) <br />❑ <br />Testing for the above components are <br />next due by: <br />y • + �� 1 <br />Note: Please be aware that 20 containment components are required <br />to be tested upon <br />i <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />THIS FACILITY IS <br />❑ <br />Corrosion protection <br />RATE, <br />Other: see below <br />This UST facility is NOT APPROVED to operate <br />EHD 23-04 <br />Rev 4/30/12 <br />UST SERVICE REQUEST INSPECTION REPORT <br />WARLIai 4P <br />MIN <br />71101 WOME W! <br />W1 <br />dALM M11" <br />ArAil <br />y • + �� 1 <br />I <br />i <br />THIS FACILITY IS <br />SUBJECT TO <br />REINSPECTION• <br />RATE, <br />EHD Inspector, <br />Received B <br />EHD 23-04 <br />Rev 4/30/12 <br />UST SERVICE REQUEST INSPECTION REPORT <br />