Laserfiche WebLink
SAN aJOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />Telephone: (209) 46&3420 Fax: (209) 46&3433 Web: www.;)jgov:org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: r <br />Inspection Date: <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon T&STS <br />Leak detector <br />❑ Caldwell System ❑ Other <br />❑ <br />❑ <br />mechanical <br />Model: <br />Facility Address: <br />electronic <br />Service #: <br />❑ <br />psi <br />(,Request <br />je0 4 <br />`i I <br />Leak detector <br />❑ <br />t <br />onniit{ Technician's Name: <br />ICC Service Technician/installer Exp. Date: <br />Manufacturer Training: <br />❑ <br />tService <br />� \/t i <br />Uh <br />by /( <br />❑ line test programmed <br />❑ <br />Corrosion protection <br />sensor <br />❑ This UST facility is APPROVED to operate <br />SERVICE <br />SERVICE <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon T&STS <br />Leak detector <br />❑ Caldwell System ❑ Other <br />❑ <br />❑ <br />mechanical <br />Model: <br />❑ <br />electronic <br />Serial #: <br />❑ <br />psi <br />❑ line test programmed <br />minutes <br />Leak detector <br />❑ <br />❑ <br />mechanical <br />Model: <br />Testing for the above components are next due by: <br />❑ <br />electronic <br />Serial #: <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />❑ line test programmed <br />❑ <br />Corrosion protection <br />sensor <br />Other: see below <br />❑ <br />❑ <br />positive shutdown <br />Model: <br />❑ <br />fail safe <br />Serial #: <br />❑ <br />NA <br />sensor <br />❑ <br />❑ <br />positive shutdown <br />Model: <br />❑ <br />fail safe <br />Serial #: <br />❑ <br />NA <br />sensor <br />❑ <br />❑ <br />positive shutdown <br />Model: <br />l <br />❑ <br />fail safe <br />Serial #: <br />❑ <br />NA <br />❑ <br />Drop tube with <br />mechanical overfill at 95% <br />❑ <br />AT ANY TIME AT EHD'S <br />Drop tube with <br />mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />❑ This UST facility is APPROVED to operate <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon T&STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon T&STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secon ary containment tes In for: j <br />V PTf <br />UDC(s) q( I Piping <br />Sump(s) UST(s) <br />1 <br />Testing for the above components are next due by: <br />Note: Please be aware that 20 containment components are required to be tested upon <br />0,04(2 1 y <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />This UST facility is NOT APPROVED to operate <br />V <br />EHD 23-04 <br />)U <br />1 <br />0,04(2 1 y <br />W ISG~ <br />i <br />l <br />! <br />THIS PACILITY IS S Rj T <br />Tb REfINSPEICTION <br />AT ANY TIME AT EHD'S <br />CURRENT HOURLY RATE. <br />EHD Inspe tor:p� �y <br />1� V <br />Received By: <br />Title,:: <br />C, J �A <br />1 1 Val�t�(Q1 <br />Rev <br />i <br />UST SERVICE REQUEST INSPECTION REPORT <br />4/30/12 <br />