Laserfiche WebLink
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjgov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />❑ .This UST facility is APPROVED to operate <br />SERVICE <br />SERVICE <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon T&STS <br />Leak detector <br />❑ Caldwell System ❑ Other <br />InspectionDateFacility : <br />Address: <br />mechanical <br />Model: <br />Onsite Service -fechnician 's Name: <br />ICC Service Tech nician/I nstal ler Date: <br />Manufacturer Trainingw <br />8 <br />❑ .This UST facility is APPROVED to operate <br />SERVICE <br />SERVICE <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon T&STS <br />Leak detector <br />❑ Caldwell System ❑ Other <br />❑ <br />❑ <br />mechanical <br />Model: <br />❑ <br />electronic <br />Serial #: <br />❑ <br />psi <br />❑ line test programmed <br />minutes <br />'II>BMW <br />Leak detector <br />t <br />❑ <br />❑ <br />mechanical <br />Model: <br />FACILITY IS SUBJECT TO REINSPECTION <br />❑ <br />electronic <br />Serial #: <br />Note: Please be aware that 20 containment components are required to be tested upon <br />❑ line test programmed <br />❑ <br />Cold start of monitoring panel <br />sensor <br />Corrosion protection <br />❑ <br />❑ <br />positive shutdown <br />Model: <br />❑ <br />fail safe <br />Serial #: <br />❑ <br />NA <br />sensor <br />❑ <br />❑ <br />positive shutdown <br />Model: <br />❑ <br />fail safe <br />Serial #: <br />❑ <br />NA <br />sensor <br />❑ <br />❑ <br />positive shutdown <br />Model: <br />❑ <br />fail safe <br />Serial #: <br />❑ <br />NA <br />❑ <br />Drop tube with <br />mechanical overfill at 95% <br />❑ <br />Drop tube with <br />mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />❑ .This UST facility is APPROVED to operate <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon T&STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon T&STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />'II>BMW <br />Secon a containment tes in for: <br />UDC(s) �,�! Piping <br />t <br />_ <br />Sump(s) UST(s) <br />THIS <br />FACILITY IS SUBJECT TO REINSPECTION <br />AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />Testing for the above components are next due by: <br />Note: Please be aware that 20 containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />This UST facility is NOT APPROVED to operate <br />EHD 23-04 <br />Rev 4/30/12 <br />UST SERVICE REQUEST INSPECTION REPORT <br />_ <br />'II>BMW <br />A0% <br />t <br />k' <br />THIS <br />FACILITY IS SUBJECT TO REINSPECTION <br />AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD Inspector: <br />Received By: <br />EHD 23-04 <br />Rev 4/30/12 <br />UST SERVICE REQUEST INSPECTION REPORT <br />