Laserfiche WebLink
SAN JOAQUIN COUNTY <br />a ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 WeWeb:www.s*qov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: 0�) <br />�Qcot <br />SERVICE <br />Inspection Date: <br />ru <br />Spill bucket ❑ minimum <br />S t X19 <br />❑ <br />❑ <br />mechanical Model: <br />Facility Address: n / ��/� p <br />Mouhoc <br />ServiceRequest <br />vi #: (r / <br />Onsite Service Technician's Name: <br />ICC Service Technician/InstallerExo_Date: <br />Manufacturer Training: <br />Jc-:�,(ToY- <br />0 <br />Leak detector <br />❑ This UST facility is APPROVED to operate <br />SERVICE <br />SERVICE <br />Spill bucket ❑ minimum <br />Leak detector <br />❑ <br />❑ <br />mechanical Model: <br />❑ <br />electronic Serial #: <br />Spill bucket ❑ minimum <br />❑ line test programmed <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />Leak detector <br />❑ <br />❑ <br />mechanical Model: <br />❑ <br />electronic Serial #: <br />❑ <br />psi <br />❑ line test programmed <br />minutes <br />sensor <br />❑ <br />❑ <br />positive shutdown Model: <br />❑ <br />fail safe Serial #: <br />❑ <br />NA <br />_ <br />_ <br />sensor <br />❑ <br />❑ <br />positive shutdown Model: <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />fail safe Serial #: <br />Cold start of monitoring panel <br />❑ <br />NA <br />Corrosion protection <br />EHD Inspector: <br />sensor <br />❑ <br />❑ <br />positive shutdown Model: <br />❑ <br />fail safe Serial #: <br />❑ <br />NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />❑ This UST facility is APPROVED to operate <br />This UST facility is NOT APPROVED to operate <br />SERVICE <br />Spill bucket ❑ minimum <br />5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum <br />5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) <br />Piping <br />Sump(s) <br />UST(s) <br />❑ <br />Testing for the above components are <br />next due by: <br />Note: Please be aware that 20 containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />REINSPECTION AT ANY <br />❑ <br />Corrosion protection <br />EHD Inspector: <br />Other: see below <br />.: <br />This UST facility is NOT APPROVED to operate <br />EHD 23-04 <br />Rev 4/30/12 <br />UST SERVICE REQUEST INSPECTION REPOR <br />Eve <br />WIN <br />40 <br />pal <br />THIS FACILITY IS <br />SUBJECT TO <br />REINSPECTION AT ANY <br />TIME AT <br />EHD'S CURRENT HOURLY <br />EHD Inspector: <br />.: <br />EHD 23-04 <br />Rev 4/30/12 <br />UST SERVICE REQUEST INSPECTION REPOR <br />