My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231464
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 10:49:09 AM
Creation date
12/14/2018 3:38:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231464
PE
2361
FACILITY_ID
FA0000914
FACILITY_NAME
TIGER EXPRESS STORES
STREET_NUMBER
1399
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1399 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> UNIFIED PROGRAM CONSOLIDATED FORINT <br /> UNDERGROUND STOWZE TANK <br /> MONITORING PLAN-(Palle I of 2) ENV!RO N M E NTA <br /> TYPE OF ACTION ❑1,NEW PLAN ❑ 2.CHANGE OF INFORMATION 4oi <br /> PLAN TYPE Z1,MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILI'T'Y. a9a z <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM <br /> I. FACILITY INFORMATION <br /> FACILITY 10#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) F w c� x _-P 116 <br /> 3 <br /> BUSINESS SITE ADDRESS, CITY <br /> 11.EQUIPMENT TESTING AND PREVENTIVE:MAI.NTEN.ANCE <br /> -testing,preventive maintenance,and calibrafion of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent;and that such work must be performed by qualified personnel. <br /> 23 CCR 2632 2634 2638 2641 <br /> MONITORING EQUIPMENT IS SERVICED Kri.ANNUALLY ❑ 99,OTHER(Specify): 41"3bb <br /> 111.MONITORING LOCATIONS, <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH TIUS PLAN. ❑2.SITE PLOT PLANIMAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49o.4 <br /> IV:TANK.MONITORING.IS PERNIL'VIED USING,THE FOLLOWINGM)ETHOD(S):. <br /> 1.CONTINUOUS ELECTRONIC TANK NIONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490.5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY_CONTAINMENT IS: ❑ a.DRY R-b.LIQUID FILLED ❑ c.PRESSURIZED El d.UNDER VACUUM 490 6 <br /> 9°.7. <br /> _ PANEL MANUFACTURER: VI e@&c4Y /-00,t- 4 <br /> oO,t' _ MODEL#, I G T 490.0- <br /> " <br /> LEAK SENSOR MANUFACTURER: I 1 1) T490'9' MODEL#(S) Q L1,390 ^,3p)dc3t7 49v-2o <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATC)SYSTEM USED TO MONITOR SINGLE WALL_T-A NK(S)-(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER 490-17 MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTI UR: 490-c4. MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c,WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHERS ci : 490-17 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0,2 h. ❑ c.OTKER Speci : 490-19 <br /> B•P• ( �') 49o-19 <br /> © 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1)-- 490,20 <br /> ❑ '4,WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: Ela.36 HOURS [3 b.60 HOURS 490-22 <br /> 490.22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-24 <br /> TEST FREQUENCY: [I a.ANNUALLY b.Ba (Spec <br /> i6,):❑ OTTIER S i 490-24 <br /> ( P �')� a90-25 <br /> 490.26 <br /> ❑99.OTHER(Specify): 490.27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that a ly)..'; <br /> 21.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-29 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a DRY ❑b.LIQUID FILLED ❑c.PRESSURIZ. ❑d-UNDER VACUUM 490 <br /> PANEL MANUFACTURER: 0-9010 MODEL#: •rL I- 490-31 <br /> LEAK SENSOR MANUFACTURER 1/ 11 _ 490.T^2 MODEL a S ; t'1 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. YES ❑b.NO 49°-x4 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. YES ❑b.NO 490-35 <br /> MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.)L LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT PLOW WREN A LEAK IS DETECTED 23 CCR 263 490.16 <br /> MLLD MANUFACTURERS: &a- -yet cyck490.17 MOREL#(S): ,� t V 1 71^�t aaa <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLD MANUFACTURER(S) 49010' MODEL#(S): 49"l <br /> PROGRAMMED IN LINE LEAK TEST: C] I I.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a YES ❑b.NO 490.44 <br /> ELLD FAILURF-MISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN, ❑a.YES ❑b.NO 49044 <br /> ❑ 4.PIPE INTEGRITY TESTING 490.45 <br /> TEST FRE UENCX a,ANNUALLY ❑ b.EVERY 3 YEARS ❑ c,OTHER S eci 49045 49047 <br /> ❑ S.VISUAL PIPE MONITORING. - 490-41 <br /> FREQUENCY ❑ &DAILY ❑ b,WEMY ❑c.MIN.MONTHLY&EACH TIME SYSTW OPERATED• 49049 <br /> •Allowed fof mohokg of unburied anefsency genuator fuel pi2ing=ly pu HSC 425281.N6 3 <br /> ❑ 6.SUCTION PIPING MEET$EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 490-40 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490.51 490-52 <br /> ❑ 99.OTHER(Specify) 490.53 <br /> t. <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.