Laserfiche WebLink
S W RCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1.FACILITY INFORMATION <br /> Facility Name: FAST AND EASY I Date of Testing: 06-06-17 <br /> Facility Address: 1399 YOSEMITE AVE MANTECA CA <br /> Facility Contact: DEEP Phone: 209-823-3460 <br /> Date Local Agency Was Notified of Testing:05-17-17 <br /> Name of Local Agency Inspector(ifresent during testing):� SAN JUA UIN CO <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: AFFORDA TEST 416 21 Street Galt,CA 95632 (209)74 - VWtf 9t)P9gthl6 <br /> Technician Conducting Test: ❑Ed Stearns ❑ Zane A.Nimmo ❑ David A. Winkler ® Felix G.Ramirez <br /> 8184188 5263322-UT 5263373-UT 5273934-UT <br /> Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ® Hydrostatic ❑Vacuum ❑ Other <br /> Test Equipment Used: TAPE/H2O Equipment Resolution: 1/16 <br /> Identify Spill Bucket(By Tank 1 87 2 91 3 DIE 4 <br /> Number, Stored Product, etc.) <br /> ® Direct Bury ® Direct Bury ®Direct Bury El Direct Bury <br /> Bucket Installation Type: ❑ Contained in ❑ Contained in <br /> ❑ Contained in Sump ❑ Contained in Sump Sum Sum <br /> Bucket Diameter: 11 11 11 <br /> Bucket Depth: 13 13 13 <br /> Wait time between applying _ _ - <br /> vacuum/water and start of test: <br /> Test Start Time(Ti): 900 900 900 <br /> Initial Reading(Ri): 12 12 12 <br /> Test End Time(TF): 1000 1000 1000 <br /> Final Reading(RF): 12 12 12 <br /> Test Duration(TF—Tl): I HOUR 1 HOUR i HOUR <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail I ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments— (include information on repairs etude prior to testing, and recommended follow-up for failed tests) <br /> OPW BUCKETS <br /> ALL BUCKETS HOLD 5 GALLONS <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: Date:06-06-17 <br /> ' State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />