Laserfiche WebLink
donlee pump company °'�° <br /> 0Vf <br /> 2825 Railroad Ave. o <br /> Ceres,CA 95307 <br /> Lic.#432089 <br /> Date: July 9, 2018 <br /> Attn: Fast N Esy#116 <br /> 1399 E. Yosemite Ave. <br /> Manteca, CA. <br /> Ph: (209)823-3460 <br /> Cell (209) <br /> Project: Install 1 OPW 2100 series Diesel fill bucket—direct bury <br /> Description of materials and services to be provided: <br /> 1) Install new bucket per state regulation to hold 5 gallons. <br /> a. <br /> OP-IC-2100 <br /> i. Spill container, 5 gallon replaceable for single wall, with drain valve for fill, <br /> cast iron cover <br /> 2) Procure all permits necessary <br /> 3) Remove concrete <br /> 4) Assist with soil sampling (if) requested by San Joaquin County Environmental Resources <br /> *see notes below <br /> 5) Back fill and test to insure they will hold 5 gallons <br /> 6) Pour concrete <br /> 7) Perform"lake test"with county inspector verify they will hold liquid. Submit results to county <br /> 8) Donlee Pump labor <br /> 9) Donlee Pump admin <br /> PROPOSED AMOUNT: $10,279.09 (tax Included 7.75%) <br /> (Proposal Terms: Deposit 50%, balance net 30 days from completion) <br /> Notes and Exceptions: <br /> ➢ Donlee Pump responsible to provide/procure any plans, permits, and/or authorizations <br /> required. <br /> ➢ Permit fees shall be invoiced in addition to proposed amount, at cost(with receipts provided). <br /> o Environmental Health Department <br /> o Fire Department <br /> o Building Department <br /> o Air Pollution Department <br /> o Soil Sampling <br /> ➢ ALL FUEL DELIVERIES—must be scheduled prior to work starting. NO fuel deliveries_ <br /> during installation of buckets. <br /> Due to soil sampling(if) required by San Joaquin County Environmental Resources if any <br /> detection the county has the right to leave the excavation area open for further analysis. <br /> ➢ Any additional materials or labor required to complete project(replace wiring, conduit, etc) <br /> will be charged"in addition" to the proposed amount on a"time-and-materials" basis. <br /> Any equipment or labor not specifically identified in the proposal is not included in the <br /> proposed amount. <br /> ➢ Payments made for project using credit card will incur an additional convenience fee of <br /> $400.00 <br /> ➢ Prices quoted above good for 30 days. <br /> If you need anything further, or have any questions, feel free to contact me. <br />