My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231464
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 9:11:29 AM
Creation date
12/14/2018 4:34:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231464
PE
2361
FACILITY_ID
FA0000914
FACILITY_NAME
TIGER EXPRESS STORES
STREET_NUMBER
1399
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1399 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Return to Compliance Certification: <br /> Enclosed is a brief summary of compliance for the violations that were listed <br /> 1. 105. The new updated monitoring plan has been uploaded on CERS as of <br /> 7/6/18. All the necessary changes under the vent secondary piping have <br /> been corrected as needed. <br /> 2. 107. An accurate UST monitoring site plan has been submitted with the <br /> pipe layout identifying the locations where monitoring is performed. <br /> 3. 204. We are waiting for the new updated monitoring plan to be approved <br /> so that we can have all the copies available at the site as soon as the plans <br /> are approved copies would be printed out from CERS & retained at the site. <br /> 4. 205. The current copy of UST response plan has been sent to the site. All <br /> the employees have been instructed that these plans should always be <br /> available on site for inspection. <br /> 5. 210. Designated operator monthly inspection reports for the last 12 <br /> months have been retained on the site. An email of these reports has also <br /> been sent to EHD department. <br /> 6. 315. It will be ensured that the sumps 5/6 are maintained free of liquid. If <br /> there is any water in the sump it should be removed and put in the waste <br /> barrel tank and further disposed of properly. <br /> 7. 318. Leak detector was adjusted on site and was held clear after the retest. <br /> 8. 319. The owner is currently working with Donlee Pump for the spill bucket <br /> fix. As of right now the owners are waiting for a estimated contract price <br /> for all the work that needs to be done to correct the violations. As soon as <br /> Donlee Pump quotes a price and owners sign the contract price, a permit <br /> would be pulled. Only delay for not pulling the permit as of right now is the <br /> cost involved in fixing this violation. Donlee pump wants to sure that the <br /> owner is aware of the expenses involved. With the most recent update the <br /> chances are that the permit would be pulled by 7/9/18. <br />
The URL can be used to link to this page
Your browser does not support the video tag.