Laserfiche WebLink
WRITTEN MONITORING- PROCEDURES' <br /> UNDERGROUND STORAGE 'T'ANZC MONTTORTNG PROGRAM <br /> T]tis monitoring program must be kept at tilt UST locl"o'i at all Limcs. Tlic inrorruation on this monitoring <br /> program arc conditions,of tlic operating periniL Tic permit holder "'us' notify San Joaquin County <br /> Environmental Health Division, phone (209) 46&3420 within 30 days of any changcs to the monitoring <br /> procedures, unless required to obtain approval before mak-iig the change. <br /> Rcquircd by Sections 2632(4) and 26.11(ih) CCR. <br /> Facility Name TIGER EXPRESS STORE <br /> Facility Address 1399 East Yosemite Ave MANTECA, CA. 95336 <br /> A. Dcscnbc the frequency of performing the monitoring: <br /> Tank_,, . ' CONTINUAL MONITORING OF INTERSTITIAL_ SPACE WIT11 AUDIO R VISUAL ALARG4 REPORTS <br /> PLUS CONTINOUOS STATISTICAL LEAK DETECTION VIA INVENTORY PRONE SENS016 <br /> Piping CONTINUALM tIlIORINO UF DOUBLE CONTAINED P,.0 II)ING WITH AUD10 & VISUAL ALARM REPORTS <br /> PUJA PRESSURE LINE LEAK DETECTORS <br /> B. What methods and cquipmcnt, identified by name and model, will be used for <br /> performing the monitoring: <br /> TankVFFnFR MOT TI S=23n im mNLTORiNG SYSTEM, wi-pi mAr. T INVENTORY PRO s> IPIIERSTITIAI <br /> SENSORS AND STP CONTAINMENT SI HP SENSORS <br /> Piping rW-- AS ABOVE <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> ALL PROBES CAN BE ACCESSED IN THE TURBINE (STP) CONTAINMENT SUMP <br /> D. List the name(s) and titic(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> ,I•RRY MORE u iMM <br /> Angie BrQya---1 UNIT MANnr�R <br /> BILL SAVAGE _ OPERATIONS SUPERVISOR <br /> , <br /> F— Reporting format for monitoring: <br /> Tank C94PUTER GENERATED ALAW HISTORY q, INVENTORY REPORTS DAILY AND ON DEMANO <br /> Piping PTLD'S AM ATTTQMATT(- gLN I�C1WIiI <br /> F. Dcscnbc the prr--cntive maintcnancc schedule for the monitoring equipment. Notc: <br /> iYfaiutcnancc muSZ be iu accordance with, clic nlauul'acturcr5' maintcnancc sclzcdulc <br /> but uotlessthanevery1-2mouths:DAILY COMPUTER GENERATED STATISTICAL ANALYSIS, SELF <br /> DIAGNOSTICS AND ANNiJAL MKIIANICAL ALAWSFNSOR ASSIIRANCF OF OPFinTION TESTS. <br /> G. Describe the training necessary for,the operation of UST system, including piping, <br /> and the monitoring equipment: <br /> ALL PERSONNEL ARE TRAINED DURING T11EIR INTITAL 30 DAYS OF EMPLOYMENT BY AN <br /> rvnrnrr"rrn ri,tnrntrrcnnv nrKM" <br />