Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: <br /> Complete the rollo ing checklist: <br /> Yes ❑ No* Is the audible alarm operational" <br /> Des ❑ No* Is the visual alarm overational'? <br /> uT4es ❑ No* Were all sensors visually inspected.functionally tested, and confirmed operational? <br /> Yes :3 No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> J Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> operational? <br /> Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate.or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) irSump/Trench Sensors; ®D penser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection'? 2-tMTi 0 No. <br /> ❑ Yes LJ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> :il-_,N�/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> till point(s)and operating properly'? If so,at what percent of tank capacity does the alarm trigger'? mo <br /> :I Yes* i ' No Was any monitoring equipment replaced? If yes, identity specific sensors, probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> El Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> Product; ❑Water. If yes,describe causes in Section E,below. <br /> 1 Y ❑ No* Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports,if applicable <br /> Yes ❑ No* Is all monitoring equipment operational ver manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 03/01 <br />