Laserfiche WebLink
5WFRCBaJanuary 2002 Paye of <br /> S. SPML/OVERFILL CONTAINMENT BOXES <br /> Facility is tot Equipped With SpilDOverfill Containment Boxes x <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested <br /> Test Method Developed By: a Spill Bucket Manufacturer dustry Standard _ Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: Pressure Vacuum C-,-<vdrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment <br /> Resolution.- <br /> . : FT, ti <br /> Spill Bos# l Spill Boa# -Z Spill Boz# Spill Boz# <br /> Bucket Dl'=etef: /•Z r! f <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rq): I I <br /> Test End Time: ) L-3 n <br /> Final Reading(RF): <br /> Test Duration: ti r <br /> Change in Reading(RF-R1): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> i <br /> Test-Result: 0 Fad" Pass:. G Fail Pass: 0 Fail D Pass <br /> Comments—(inciude information on repairs made prior to teeing, and recommended follow-up for failed tests) <br />