My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985 - 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231464
>
COMPLIANCE INFO 1985 - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 1:55:45 PM
Creation date
12/20/2018 2:08:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985 - 2003
RECORD_ID
PR0231464
PE
2361
FACILITY_ID
FA0000914
FACILITY_NAME
TIGER EXPRESS STORES
STREET_NUMBER
1399
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1399 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE SPECIFIC S1%r' <br /> ETY PLAN <br /> INTRODUCTION <br /> This document describes the health - <br /> and sa_ety procedures for the <br /> activ3 ties planned in nP_f orming a preliminary site investigation at <br /> pll Personnel and <br /> subcontractors Will follow this plan. The prime responsibility mor <br /> employee safety lies with each company that is involved in the work <br /> for it' s own employees. It is expressly intended that all project <br /> work will comDly Wi t applicable Sections or the California <br /> occupational Health and safety code. All Darties working_ on this <br /> project will ma'II air. a genera! res-Dons;h' lrty t0 identify and <br /> correct any nealin and safety hazards and are responsible b4' Wo_-K nC <br /> n a safe manner. <br /> - - - <br /> Key Personnel <br /> =rOjec= personnel Wac wll1 have overall rzsDonsiD_l _ty =or `no 5c=� <br /> oDe=a_i on cf t is a:-c-: _ - __ <br /> Site C o n t a c t_ (-, ,-) t/ C h DO W L v <br /> i <br /> DA IV Jv y E IV 5 /L <br /> Project inanager and 14 0 C /L D 6, w P y <br /> Sit-_ Safety Office-- <br /> Ell i te 1V_ Contractors (209) 451 5337 <br /> lax 46_ 53e2 <br /> ProjeG-z: Manager and Safa�::y Of-ficer nesDonsibilities : <br /> * To conduct iaiti=? s-tesafety n=a_ning for all project <br /> ria1C t=am meribers as desC:='ec iL Lrs_S QOG'1illeIIt, <br /> * To ass l-e all _i e1d 'team personnel have read and <br /> Linde=st_=nd the and Sa=e-v p i =n <br /> * To assure neat all work DeT'lormed on this ' <br /> project s <br /> conducted in a sa=e manner, - y - <br /> * To coordinate with field personnel fi re-watch, traff i c <br /> control and site security, <br /> SITE SkFETY PLM (SSP) - I <br />
The URL can be used to link to this page
Your browser does not support the video tag.