My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2010 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
BILLING 2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 10:31:50 AM
Creation date
12/20/2018 4:36:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2010 - 2015
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amok Adak <br /> SAN JOAQU . OUNTY ENVIRONMENTAL HEALTH WARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 2 <br /> VI. DISPENSER MONITORING <br /> MOG OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M50. <br /> L CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: M51. MODEL#: M52. <br /> 00 <br /> LEAK SENSOR MANUFACTURER: M53 MODEL#(S): ' /�/ M54. <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a.YES Wb NO M55. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? D a.YES .NO M56. <br /> ILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES b.NO M57. <br /> 2.MECHANICAL ASSEMBLY(e.g.,FLOAT ANDLCHAIN��A��SSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF AK �1�y <br /> .. ASSEMBLY MANUFACTURER: le " 40 Mss. MODEL#(S): y �M59. <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) M60. <br /> ❑ 4.NO DISPENSERS <br /> ❑ 99.OTHER(Specify) M61. <br /> VII. ENHANCED LEAK DETECTION <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFE E DOCUMENTS MAINTAINED AT FACILITY'(Check all that apply) Mao. <br /> I. THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. O�OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. Eff THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 1/01/2005) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99.❑ OTHER(Specify): Mal. <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br /> By January 1,2005 this facility will have a"Designated UST Operator"who has passed the operator exam administered by the International Code Council(ICC). By <br /> January 1,2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems. <br /> This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ ❑❑❑❑❑❑❑❑❑❑❑❑❑' _ -❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑❑The facility <br /> ➢ The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after January 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION <br /> Please use this section to include any additional UST system monito ing-related information(e.g.,additional information required 9j your local agency): Mas. <br /> TYPE OF OVERFILL REVENTION= ��,qr n�. ��C��^� \ �1��� �}, //� �C �jI n• <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF I/1/05, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION— <br /> FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR§2715(b). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATII)N:j certiff that the' o ,tion provided herein is true and accurate to the best of my knowle e. <br /> OWNER/OPE O IGN UR) / REPRESENTING DATE M91 <br /> m O M90. <br /> perator <br /> OWNS ERATP NAME(print M92. OWNER/O RATOR TITLE: M93. <br /> Z-/ <br /> (Agency Use Only) This plan has been reviewed and: ❑Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: <br /> Comments/Special Conditions: <br /> SJCEHD-d(07/03)-3/4 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.