My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2010 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
BILLING 2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 10:31:50 AM
Creation date
12/20/2018 4:36:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2010 - 2015
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK SYSTEM <br /> DESIGNATED OPERATOR FACILITY EMPLOYEE TRAINING RECORD <br /> For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br /> Authority Cited: Title 23, Div. 3, Ch. 16 California Code of Regulations(CCR) <br /> Facility Name: Tracy 76 - Reliance Gas Investments, Inc. <br /> Facility Site Address: 2420 W. Grantline Road City: Tracy <br /> Section 2715 of Title 23, California Code of Regulations, requires that Designated Underground Storage Tank Operators <br /> provide training to facility employees who have responsibilities associated with the operation and/or maintenance of <br /> underground storage tank (UST) systems. This training must be provided by July 1, 2005, and every 12 months thereafter. <br /> For facility employees hired after July 1, 2005, the initial training must be provided within 30 days of the date of hire. At <br /> least one of the facility employees present during operating hours must have current training.This training must include,but <br /> is not limited to,the following items as specified in 23 CCR Sections 2715(f)(1)and(2): <br /> ❑ Operation of the UST system in a manner consistent with the facility's Best Management Practices; <br /> ❑ The employee's role with regard to UST monitoring equipment as specified in the written UST Monitoring Plan; <br /> ❑ The employee's role with regard to spills and overfills as specified in the written UST Response Plan; <br /> ❑ Name(s)of contact person(s)for emergencies and monitoring equipment alarms; <br /> ❑ For facilities that are not routinely staffed,facility employee responsibilities as specified in the training program <br /> approved by the local UST regulatory agency. <br /> 23 CCR§2715(f)(3)requires that a list of employees who have been trained by the Designated Underground Storage Tank <br /> Operator(s)be maintained on-site,or off-site at a readily-available location if approved by the local agency,and provided to <br /> the local agency upon request.Completion of this form will satisfy UST training record keeping requirements.The following <br /> employees have been trained as required by 23 CCR Sections 2715(f)(1)and(2): <br /> Facility Employee Name Training Date Hire Date' Trainer Name2 <br /> TPD h <br /> (Continued on reverse) <br /> If hired after July 1,2005. <br /> 2 Trainer must be a current Designated UST Operator for the facility at the time of training. <br /> UN-061-1/2 www.unidocs.org 07/13/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.