My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
COMPLIANCE INFO 2012 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 2:41:11 PM
Creation date
12/21/2018 3:49:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2017
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br />F. In -Tank Gauging / SIR Equipment: 19 Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />�.Vlll IGLU <br />Yes <br />LLV 1 <br />E] No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: 9 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />❑ Yes <br />[:1 No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />14 N/A <br />or disconnected? <br />❑ Yes <br />E] No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />J] N/A <br />❑ No* <br />or fails a test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ Yes <br />[( N/A <br />Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H, below, describe how and when these deficiencies were ur will --1 <br />H. Comments: <br />Page 3 of 4 <br />UN -036 — 5/6 www.unidocs.org Rev. 01/17/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.