My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
COMPLIANCE INFO 2012 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 2:41:11 PM
Creation date
12/21/2018 3:49:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2017
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/23/2017 RP� c7- IVED <br /> AUG z32017 <br /> Inspection Date 5/9/17 (ENVIRONMENTAL HEALTH, <br /> DEPARTA EW <br /> Vio 103-We uploaded a current Financial responsibility and Letter of Chief of financial off icer to CERS. <br /> Vio 104- 1 have edited all primary containment for each tank diesel, 87 & 91. <br /> Vio 105—We have changed the vapor recovery primary containment to NONE in the Vent, VR, and <br /> riser/fill pipe piping construction area on CERS. <br /> Vio107-We uploaded a site plan on CERS. <br /> Vio 113-We will ensure that test results be submitted within 30 days. <br /> Vio 121- 1 have sent the RTC documents to Aaron Hang via Email. Moving forward we will ensure that <br /> we will provide a written response to the EHD within 30 days of receiving an inspection <br /> Vio 204-A copy of each a monitoring plan for each tank has been printed from CERS and filed in our <br /> documents onsite. <br /> Inspection Date 5/3/16 <br /> Vio 103-We uploaded a current Financial responsibility and Letter of Chief of financial officer to CERS. <br /> Vio 105-We have changed the vapor recovery primary containment to NONE in the Vent, VR, and <br /> riser/fill pipe piping construction area on CERS. <br /> Vio 107-We uploaded a site plan on CERS <br /> Vio 113-We will follow up with the company to make sure test results are submitted in a timely manner <br /> & ensure that test results be submitted within 30 days. <br /> Vio 121- 1 have sent the RTC documents to Aaron Hang via Email. Moving forward we will ensure that <br /> we will provide a written response to the EHD within 30 days of receiving an inspection <br /> Vio 209- Elite IV&Aforda Test are our certified technicians that fill out the do forms. We will double <br /> check the form before departing. <br /> Inspection Date 5/18/15 <br /> Vio 201-The containment test report conducted on May 14, 2012 was printed an added to our yellow <br /> underground storage file folder. <br /> -Reliance Gas Investments INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.