Laserfiche WebLink
FIELD INVESTIGATION TEAM <br /> SITE HEALTH AND SAFETY PIAN <br /> A. GENERAL INFORMATION <br /> Client: <br /> Moore Petroleum, Inc. Aegis Project Number: 90-098 <br /> Site Name: Frank's Exxon #2 <br /> Claim Number: 832-181 <br /> Street Address: 1399 East Yosemite Avenue, Manteca, California <br /> Date: April 2, 1991 <br /> Plan Prepared by: REK <br /> Approved by: BG <br /> Date: April 3, 1991 <br /> Date: <br /> Revised by: <br /> Approved by: <br /> Date: <br /> Revision App <br /> Objectives: Phase I-Further define the extent(if any)of petroleum hydrocarbons in soil <br /> ~" and groundwater by drilling, sampling, well completion and analytical <br /> testing. <br /> Proposed date of Investigation: April 1991, pending permitting and approval <br /> Hazard Summary/Level of Protection <br /> B: C. p; )CX (with modifications) <br /> A: :_ <br /> i <br /> L <br />