Laserfiche WebLink
� D SITE SAFETY WORK PLA <br /> PERSONNEL <br /> TeTitle. R s n ibili <br /> David Poulsen Staff Geologist Field Services/ <br /> Assistant SSO <br /> Robert E. IGmmerling Project Manager Site Coordinator/ <br /> Site Safety Officer <br /> Clarke H. Owen Senior Geologist Senior Review/ <br /> Project Oversight <br /> PERIMETER ESTABLISHED <br /> Map/Sketch Attached? Yes XX No— <br /> Site Secured? Yes— No XX <br /> Perimeter Identified? Yes— No XX <br /> Contamina#ion zonas identified? line defined? Yes— No 2% <br /> Free Product? Yes No XX <br /> Dissolved Product? Yes XX No— <br /> INVESTIGATION-DERIVED MATERIAL DISPOSAL: <br /> Soil from investigative activities will be stockpiled and stored temporarily on site until <br /> analyses are available to describe the levels of petroleum hydrocarbon constituents <br /> contained in them. Soil stockpiled on site will be placed on and covered by plastic <br /> sheeting. Any material disposed off site will be disposed of in accordance with existing <br /> regulations and guidelines. Well development and rinse water will be stored temporarily <br /> on site in DOT approved 55-gallon drums pending laboratory analysis. <br />