Laserfiche WebLink
1..J • <br /> CTS ENVI ROWEN'TAL PROJECT 304 <br /> PAGE '(r <br /> 4.0 RECOMMENDATIONS <br /> It is the profEs}icnal racomwcndx.tiori of ETS <br /> Environmental that two additional soil boring/monitoring <br /> wells be installed at this tirne to complete a triangle in <br /> order to provide further soil and groundwater definition. <br /> Sail arid groundwater- sample!' should be colIer=ted and analyzed <br /> following the procedure and methods previc,u5ly described. <br /> Further, the calculztior, of the hydraulic gradient is <br /> essential before a syat£:matic Site '.nvet�tigatiori cars be <br /> stArted. <br /> Once a hydraarlic gradient direction has been determined, <br /> additional sail borings can be located as needed. At this <br /> tirre there would be little benefit in determining the <br /> locations of additional sail borings. <br /> 5,10 REMARKS ANI) SIGNATURES <br /> This preliminary site assessment and the SCOPe elf work <br /> described herein has been prepared using standard industry <br /> practices and represents our professional opinions. <br /> Prepared By; <br /> Glen White Date <br /> Project Geologist <br /> Reviewed arid Apprclvedy BY: <br /> Dick Stratton Date <br /> General Manager <br /> And: <br /> r <br /> Steve Randall <br /> Registered <br /> istered <br /> M <br /> 37 <br /> -----C i v rk_.-Engineer------------ --- --- ---- Y -------- ------ <br />