Laserfiche WebLink
nMPLING r'ROTOCaL <br /> Fate: f_ <br /> iuvntdi�,tely for deliver^y t. tht iaborat_•ry, and t+i11 ,_tr,der nn <br /> e it c,_trastar,ees be c,per,ed by c-rr,yor:e other L'I�an l�bntatt'r'y' <br /> per acnnel. Chair, f C, -1y r+-cards will be rnatir,Lained at <br /> all times. <br /> ,3 aritples will be analyzed by a ltabo, .:.tory specifically <br /> certified by the C:alifcrr,r,:La Depzrtrner,t of Health Services to <br /> pe -form <br /> the �.nalysis req,tested. sample., will riot be tr=sted <br /> after their- sea:aple lire has been exceeded atecording to EPA <br /> g,_tidelir,es, arid will be properly diGpose:d of after analy:.i-. <br /> GoIL SAMPLING <br /> All soil sar,tpling pq,_tiprner,t wil- be thoroughly s'teant- <br /> cleaned before sarnpiin9 and between anraplir,g to prevent <br /> cross-ccrrtarninatien. Rea ;,ively ,_rr,disturbed sail vaarnples <br /> in <br /> will be taken at inter^vats of noL "'tet- than five feet ials; however, this <br /> order to evaluate the subsurface mater <br /> sampling interval may be waived in sa-;Urated sands Or gravels <br /> in, which saraple recovery is not possible. <br /> The soil 5;�arnples will be collected using a California <br /> Modified split--spoor, sarnpler with brass liners. The sarnpler <br /> t4ill be driven by a 14Cr po,.tr,d haTilmer, repeatedly falling 3Ct <br /> incites {ASTM St •: dard 187 . <br /> The laboratory safrtples will t-jot have heed ',pace herd will <br /> be immediately sealed in their liners ,_tying al,_mirum foil <br /> are taped in place. The rernainir:g <br /> lined plastic cap', that for <br /> saraple will be ramoved from its liner t'-. be a£oloie3t in <br /> analysis, if appropriate, arr,d to aid the -site <br /> g <br /> 1'T'g9ir,g the rraterial. <br /> GRdjjlyDWATER SAMPLING <br /> All �:.-kmpling equipment, c <br /> ir, lud'•--i the pump, ba I and <br /> cables will be disassetabled if appropriate arid steam cleared <br /> pr^itr t,_ c,.rnntencement of sampling. Thee linced`t�et will <br /> also be follow <br /> betweer, each well ar rr 9 p ' <br /> the end c.f the sar,tpling day. De.- <br /> ionized or or_yar,ic- free <br /> water will then be introduced into the pump or bailer as the <br /> last stages of Clearsir,rq prior- to the taking Of each sample. <br /> - lrnr,tediatelY--...pr'.io3 ._ t a -yr'-rzpl i.t �}, <br /> wator levels arid well <br /> depth rsteasurer=tents will be <br /> taken it, gill wells <br /> at-... _e--yt er ... <br /> Each well. will be evacuated ,_tying a ,ell,n <br /> badder pump er a <br /> Teflon bailer. At least thrt=e we'll vc,.uToes will bs, evac,.tated <br /> From the wells. F'aarar{teter� of the w,3ter condition will be <br /> from the sand logged during the t vac�_tatiny-1. Th'_se: p <br /> PH. samples wall <br /> ,hall and incl sd+_ terirpet-attire, conductivity p <br /> .s <br /> be collected onlyafter at 1_ t t}t'rce taeli volurnE's havo bt'en <br /> removed and the rnearured paraweters havtz stabi 1 i ted. <br /> �rrrrremwmrmornnrr - _-- ��® i <br />