Laserfiche WebLink
r= <br /> CONTEUTS <br /> 1.0 INTRODUCTION 1 <br /> 1.1 Authorization and Purpose 1 <br /> 1.2 Scope of Work 1 <br /> 2.0 BACKGROUND INFORMATION 2 <br /> 2.1 Site Setting <br /> 2.2 Summary of Previous Work 3 <br /> 3.0 RESULTS OF RECENT INVESTIGATION ACTIVITIES 3 <br /> 3.1 Drilling and Soil Sampling 3 <br /> 3.2 Monitoring Well Installation and Development 3 <br /> 3.3 Installation of Below-Ground Compon-ants of a 6 <br /> Soil Venting System <br /> 3.4 Site Soils and Geology 7 <br /> 3.5 Soil Analytical Results 7 <br /> 3.6 Hydrogeology 10 <br /> 3.7 Ground-Water Analytical Revults 11 <br /> 4.0 DISCUSSION OF RESULTS 13 <br /> 4.1 Extent of Petroleum Constituents in Snail 13 <br /> 4.2 Extent of Petroleum Constituents in Ground Water 13 <br /> 5.0 REMEDIATION ALTERNATIVES 14 <br /> 5.1 Soil 14 <br /> 5.2 Ground Water 15 <br /> 6.0 RECOMMENDATIONS 18 <br /> - 7.0 REMARKS/SIGNATURE 19 <br /> TABLES <br /> TABLE 1 Tank Information 3 <br /> TABLE 2 Soil Analytical Results 8 <br /> TABLE 3 Ground Water Elevation Data 11 <br /> TABLE 4 Ground water Analytical Results 12 <br /> TABLE 5 DREAM Input Parameters 16 <br /> -- FIGURES <br /> FIGURE 1 Site Location Map <br /> FIGURE 2 Site Map <br /> FIGURE 3 Plan View of Below-Ground Components of a Soil <br /> Venting System <br /> FIGURE 4 Geologic Cross-Section A-A' and B-B' <br /> FIGURE 5 Interpreted Areal Extent of Petroleum Constituents <br /> in Soil <br />