Laserfiche WebLink
r4IMLEM A55MMEN!REPOW <br /> INCLUDINO OUAMEnLY M=T0"N0"EP"'f <br /> 6- t399 East Yosemno Avenue,Manteca,CaII10(n a <br /> F-� 3.3 Soil Sam le Anal [cal Results <br /> A total of four soil samples from the monitoring well borings were submitted for chemical <br /> analysis. The selection of samples for analysis was based on PID screening, odor <br /> observation, soil classification and depth. All soil samples were analyzed for BTEX, EDC, <br /> EDB, and TPH, as gasoline, by EPA Method 8260 and CAL DHS Draft TPH (modified). <br /> Toluene was detected in the soil sample from 23.5 feet depth in MW-4 at a concentration of <br /> 0,006 ppEn (Table 2). Benzene, a#hylbenzene, xylenes, EDC EDB, and TPH, as gasoline, <br /> above detectable limits. No concentrations of chemicals above detectable <br /> were not found <br /> lfrom <br /> cross-sections!olresults hand <br /> limits werefoui ihownothe n Figure4 ad on Table <br /> previous investigations ss s <br /> 3.4 M1onitarin Weil instattation <br /> Groundwater data collected during previous investigations indicated that the approximate <br /> groundwater flow direction beneath the site was to the west. Monitoring wells MW-4 and <br /> MW-5 were located to determine the upgradient and ambient groundwater conditions. MW-4 <br /> and MW-5 were constructed as 4-inch groundwater monitoring wells. Monitoring well MW-1 B <br /> was constructed as a 6-inch-diameter recovery well by drilling out the existing 2-inch-diameter <br /> well MW-1A. The monitoring wells were installed, developed, and sampled according to the <br /> standard operating procedures in Appendix A. Monitoring well construction details are <br /> included in Appendix B. <br /> 3.5 Groundwater Level Measurements <br /> Groundwater level measurements were taken by Aegis on February 1, 1991, from the three <br /> existing on site wells (MW-1A, MW-2, and MW-3). Water level measurements were again <br /> taken on February 27,April 1,April 23; and May 28, 1991. All measurements were made from <br /> y referenced wellhead elevations and measured to the nearest 0.01 foot. <br /> As discussed in the previous sections, MW-1B, MW-4, and MW-5 were installed on <br /> June 20, 1991. On June 27, 1991, wellhead and casing elevations of the five on site wells <br /> (MW-1 B,MW-2,MW-3, MW-4, and MW-5)were surveyed and referenced to a City of Manteca <br /> datum by aCalifornia-licensed surveyor. Water level measurements taken on June 26 and <br /> July 22, 1991, were referenced to the newly surveyed elevations. Table 5 summarizes the <br /> groundwater elevations for the site for 198B through 1991. <br /> Groundwater elevations we - observed to range from 14.03 to 14.15 feet above MSL during <br /> the July 22, 1991, sampling :vent. The potentiometric surface of the groundwater at the site <br /> ` on July 22, 1991, is shown on Figure 5. The direction of groundwater flow beneath the site <br /> � is approximately toward the west-northwest, <br /> ft. Depth-to-groundwater dunhydraulic g g tabes sampling <br /> int for the <br /> July 22, 1991, data was approximately 0.002 ft/ft. <br /> event was approximately 26 to 27 feet below existing surface grade. <br /> �o-0eac.�PT <br />