Laserfiche WebLink
99 AEGIS ENVIRONMENTAL, INC. <br /> STANDARD OPERATING PROCEDURE <br /> RE: GROUNDWATER PURGING AND SAMPLING <br /> SOP-7 <br /> Prior to water sampling, each well is purged by evacuatingoom continue until either the dischargemum of three lof <br /> - volumes of groundwater. When required, purging <br /> water temperature, conductivity or pH stabilize, a maximum of ten well-bare <br /> he°pracotlical� the <br /> groundwater have been recovered o the well is bailed dry. <br /> groundwater the water Isvel in the well recovers to at least <br /> sample should be taken when <br /> 8D%of its static level. <br /> �- The sampling equipment consists of either a Teflon baiter,em sVdedicated to the well,theer or stainless m <br /> bladder pump with a Teflon bladder. It the same 9 Y bladder. <br /> but the bladder pump is PVC with a polypropylene <br /> the bailer is usually Teflon, anal sis,fort✓-milliliter (ml) glass, <br /> In general and depending on the intended laboratory Y <br /> volatile-organic-analysis (VOA) vials, with Teflon septa, are used as sample containers. <br /> e is <br /> The groundwater sample is decanted into is quich ckly <br /> secu ed to the op of thein such a manner avial. The <br /> no eniscus at the top of the vial. A cap is qu Y resent. it none are <br /> vial is then inverted and gently tapped to see if air bubbles are p <br /> resent,the vial is labeled and refrigerated forshould <br /> include aundery, eun unique sam <br /> p Label information ple identification <br /> the analytical laboratory. a of analysis requested and the <br /> number, job identification number, date, time, type <br /> sampler's name. <br /> control purposes, a duplicate water sampled a triptb blank s prepared at the <br /> from each well. This <br /> For quality p When required, a trip <br /> sample is put on hold at the laboratory. <br /> laboratory and placed in the transport cooler. It is labeled similar to the well s y along h the <br /> remains in the cooler during transport and is analyzed by the a oor to field when <br /> groundwater samples. In addition, a field blank may e prepared <br /> ld blank is prepared after a pump bailer <br /> sampling equipment is ndedicated.rrperly�washed, prior to use in the next well, and is <br /> has been along steam cleaned <br /> analyzed along with the other samples. The <br /> to field <br /> prevblank <br /> ent ossycon amination. tes the <br /> effectiveness of the infield cleaning p <br /> l well development and <br /> To minimize the potential for cross-contaminationowe <br /> ll ,S eitherr sten wells, am cleaned or properly <br /> water sampling equipment not dedicated led in order <br /> washed between use. As a second <br /> eco nsprecautionary r bushed by a vailable Prl®vio s analyses. <br /> of least to highest concentrations <br /> t <br /> - ------:� -------------APPENDIXISOP-M-6 5990 <br />