Laserfiche WebLink
MM <br /> f <br /> PFKFOSED WORK PLAN FOR UM=ADDrTK)NAL SITE ASSESSMENT <br /> 1399 East Yosemlto Avenue,Manteca,CaWarnia <br /> -" ANALYTICAL LABORATORY AND PRACTICAL QUANTITATION LIMITS <br /> The laboratory to be used for the analyses discussed above is tentatively identified as <br /> Coast-to-Coast Analytical Services of Napa, California, a state-certified analytical <br /> laboratory. Selected soil and groundwater samples will be collected and submitted to the <br /> laboratory in accordance with Aegis' SOP. <br /> + Per the recommendations of the Tri-Regional Board Staff for Preliminary Evaluation and <br /> Investigation of Underground Tank Sites, dated 10 August 1990,the practical quantitation <br /> reporting limits for the soil and water analyses are as follows: <br /> Soil mg/ka (ppm) Water j..lq/kg (ppb) <br /> TPPH, as gasoline 1.0 50.0 <br /> BTX&E 0.005 0.5 <br /> f . . <br /> REPORT PREPARATION <br /> " _•t A results report will be prepared after receipt of the analytical results. The report will be <br /> factual in nature, presenting the results of the investigation. Further work, as ne.essary, <br /> will be addressed in subsequent work plans. <br /> The report of the proposed investigation will include, but not necessarily be limited to: a) <br /> discussions of the site background, investigative methods used and local and regional <br /> hydrogeology; b) a review of prior related work, as available and appropriate; c) boring <br /> -t logs; d) well construction details; e) laboratory analytical data, and f) laboratory reports <br /> and chain-of-custody forms. <br /> PROJECT CONTACTSIREPRESENTATIVES <br /> Mr. Robert E. Kimmerling, Project Engineer <br /> Aegis Environmental, Inc. <br /> 801 Riverside Avenue, Suite C <br /> Roseville, California 95678 <br /> a (961) 782-2110 <br /> Mr. Jerry Moore <br /> Moore Petroleum, Inc. <br /> Post Office Box 67 <br /> Banta, California 95304 <br /> 1 (209) 835-2750 <br /> 90-098A.WPN -5• <br />