Laserfiche WebLink
FIELD INVESTIGATION TEAM <br /> SITE HEALTH AND SAFETY PIAN <br /> A. GENERAL INFORMATION <br /> 1 r-- <br /> Ci;ent: Moore Petroleum, Inc. Aegis Project Number: 90-098 <br /> Site Dame: Frank's Exxon #2 <br /> ' Claim Number: 83Z-161 <br /> Street Address: 1399 East Yosemite Avenue, Manteca, California <br /> Plan Prepared by: REK Date: April 2, 1991 <br /> Approved by: BG Date: April 3, 1991 <br /> Date: <br /> Revised by: <br /> I <br /> 4 r-, Revision Approved by: Date: <br /> Objectives: Phase I-Further define the extent(if any) of petroleum hydrocarbons in soil <br /> l <br /> and groundwater by drilling, sampling, well completion and ana yt c <br /> testing. <br /> s Proposed date of Investigation: April 1991, pending permitting and approval <br /> Hazard Summary/Level of Protection <br /> A: B: C: D: XX (with modifications) <br /> 7 <br /> i <br /> 1 <br /> } <br /> i <br /> { <br /> i <br /> } <br /> I <br />