Laserfiche WebLink
r+ <br /> D. SITE SAFETY WORK PLAN <br /> PERSONNEL <br /> Team Member Title Res onsibili <br /> M David Poulson Staff Geologist Field Services/ <br /> Assistant SSO <br /> �. Robert E. Kimmerling Project Manager Site SaferyitelnatorOfficer <br /> Clarke H. Owen Senior Geologist Senior Review/ <br /> Project Oversight <br /> 1 ' <br /> ~, PERIMETER ESTABLISHED <br /> 3 <br /> Map/Sketch Attached? Yes XX No_ <br /> Site Secured? Yes--No <br /> Perimeter Identified? Yes No XX <br /> contamination zones identified? line defined? Yes No XX <br /> Free Product? Yes No XX <br /> Dissolved Product? Yes XX No <br /> INVESTIGATION-DERIVED MATERIAL DISPOSAL: <br /> Soil from investigative activities will be stockpiled and stored temporarily on site until <br /> _ <br /> e available to describe the analyses arlevels of petroleum hydrocarbon constituents <br /> contained in them. Soil stockpiled on site will be placed on and covered by plastic <br /> sheeting. Any material disposed off site will be disposed of in accordance with existing <br /> regulations and guidelines. Well development and rinse water will be stored temporarily <br /> on site in DOT approved 55-gallon drums pending laboratory analysis. <br /> i <br /> 155 <br /> l <br /> 1 <br /> 4 <br />