My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006038
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1399
>
3500 - Local Oversight Program
>
PR0543988
>
ARCHIVED REPORTS XR0006038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2018 11:02:06 AM
Creation date
12/28/2018 11:01:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006038
RECORD_ID
PR0543988
PE
3500
FACILITY_ID
FA0000914
FACILITY_NAME
TIGER EXPRESS STORES
STREET_NUMBER
1399
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1399 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' QUARTERLY GFlOIJNMATER MONUMING R 93M <br /> 1399 East Yosemite Avenue Manteca Catifornia <br /> 1.0 INTRODUCTION <br /> ' This report documents the results of groundwater monitoring conducted by Aegis <br /> Environmental, Inc (Aegis), from August 1991, through January 1992, at the Moore <br /> Petroleum, Inc (Moore Petroleum), service station located at 1399 East Yosemite Avenue <br /> ' in Manteca, California (Figure 1) The monitoring included the collection of monthly <br /> depth-to-groundwater measurements and quarterly groundwater samples from five <br /> monitoring wells, MW-1 B, MW-2, MW-3, MW-4, and MW-5 located on site (Figure 2) This <br /> ' report is based, in part, on information obtained by Aegis from Moore Petroleum and is <br /> subject to modification as newly acquired information may warrant <br /> 1 <br /> 2.0 SITE DESCRIPTION <br /> ' The Yosemite Avenue Moore Petroleum service station is located on the northwest corner <br /> of the intersection of Northwoods and East Yosemite Avenues in the Manteca (Figure 2) <br /> ' The site is located in a commercial area of eastern Manteca The site is bounded on the <br /> north by a small shopping complex, on the west by a fast food restaurant, on the south <br /> by East Yosemite Avenue, and on the east by Northwoods Avenue Details of the site's <br /> ' current and former facilities, including previous and existing underground storage tanks, <br /> were reported by Aegis in a "Problem Assessment Report, Including Quarterly Monitoring <br /> Report," dated November 12, 1991 <br /> 3.0 BACKGROUND <br /> ,1 In August 1988, Earth Treatment Systems drilled four soil borings (SB-1 through SB-4) <br /> and converted SB-4 to a 2-inch monitoring well (MW-1) to an approximate depth of 36 5 <br /> feet <br /> In April 1989, Delta Environmental Consultants, Inc , drilled and installed wells MW-2 and <br /> MW-3 with 2-inch-diameter casing to an approximate depth of 36 5 feet each On <br /> September 26, 1989, three underground storage tanks and associated product lines were <br /> removed <br /> In June 1990, Nations Groundwater Associates supervised the abandonment of MW-1 <br /> The well had been damaged during the removal of the underground storage tanks in <br /> ' September 1989 Monitoring well MW-1A was then drilled and installed approximately 10 <br /> feet east of the former location of MW-1, and was completed as a 2-inch-diameter well <br /> ' to a total depth of approximately 36 5 feet <br /> Aegis began a program of quarterly groundwater monitoring in February 1991 Monthly <br /> monitoring of groundwater levels and quarterly sampling of groundwater has continued <br /> since then On June 20, 1991, Aegis installed monitoring wells MW-113, MW-4, and MW-5 <br /> on the site Wells MW-4 and MW-5 were completed with 4-inch-diameter casing to an <br /> ' approximate depth of 35 feet below grade Well MW-113 was completed with 6-rnch- <br /> diameter casing by "over-coring" the former MW-1A <br /> '' 90-098G RPT <br />
The URL can be used to link to this page
Your browser does not support the video tag.