My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1888
>
2900 - Site Mitigation Program
>
PR0505473
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2019 8:46:14 AM
Creation date
1/4/2019 8:45:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505473
PE
2950
FACILITY_ID
FA0006794
FACILITY_NAME
AMERICAN SAVINGS BANK
STREET_NUMBER
1888
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95202
APN
17726023
CURRENT_STATUS
02
SITE_LOCATION
1888 LOCKHEED CT
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK PLAN <br /> FOR <br /> PHASE H ENVIRONMENTAL ASSESSMENT <br /> AT <br /> AMERICAN SAVINGS BANK <br /> STOCKTON BRANCH <br /> 1888 LOCKHEED COURT <br /> STOCKTON, CALIFORNIA <br /> CRC Environmental Risk Management, Inc. (CRC) proposes performing a subsurface <br /> investigation at the American Savings Bank (ASB) Stockton/Air Metro property located at 1888 <br /> Lockheed Court in Stockton, California (see Site Location Map). The purpose of this <br /> investigation is to determine if the soil at the subject property has been impacted by petroleum <br /> hydrocarbons from two (2) 3-stage clarifiers associated with a car wash and a plane wash. The <br /> proposed investigation will be accomplished by soil coring and soil sampling. The site specific <br /> tasks of the Work Plan will consist of the following: <br /> SCOPE OF WORK <br /> PERMITTING <br /> A permit for the subsurface environmental investigation will be obtained in accordance with the <br /> requirements of the San Joaquin and/or local government regulatory agency. <br /> WORK SCHEDULE <br /> CRC will schedule the field work as soon as necessary permits are obtained. The soil coring <br /> and sampling is anticipated to be completed within one day. <br /> UTILITY SURVEY/NOTIFICATION <br /> CRC will notify Underground Services Alert (USA/Dig Alert) forty-eight (48) hours before the <br /> scheduled start of the field work. <br /> TAILGATE HEALTH AND SAFETY MEETING <br /> Before the start of field operations, a Tailgate Health and Safety Meeting will be conducted each <br /> day by the Project Manager or Health and Safety Officer to discuss anticipated risks and health <br /> hazards and the proper precautions that need to be observed. <br /> American Savings Bank Project#2100-247-5 <br /> CRC Environmental Risk Management,Inc. 1888 Lockheed Court <br /> September 15, 1994 Stockton, California <br />
The URL can be used to link to this page
Your browser does not support the video tag.