My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4899
>
2200 - Hazardous Waste Program
>
PR0538592
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2019 4:42:02 PM
Creation date
1/7/2019 3:13:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0538592
PE
2227
FACILITY_ID
FA0017953
FACILITY_NAME
QUALITY FLEET SERVICE CENTER
STREET_NUMBER
4899
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17746022
CURRENT_STATUS
01
SITE_LOCATION
4899 S AIRPORT WAY
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aboveground Storage Tank Assessment <br />QUALITY FLEET SERVICE CENTER <br />VAN DE POL ENTERPRISES, INC. <br />4899 South Airport Way, Stockton, California <br />TABLE OF CONTENTS <br />SECTION <br />PAGE <br />1.0. INTRODUCTION................................................................................................... 4 <br />2.0. TANK ASSESSMENT...........................................................................................4 <br />2.1. ABOVEGROUND STORAGE TANK (AST) DESCRIPTION .............................. 4 <br />2.1.1. AST Name and Markings............................................................................. 4 <br />2.1.2 AST Age and Remaining Service Life ......................................................... 2 <br />2.1.3. Aboveground Storage Tank (AST) Construction ......................................... 2 <br />2.1.4. AST Ancillary Equipment............................................................................. 2 <br />2.2. OVERFLOW PROTECTION.............................................................................. 2 <br />2.2.1. Piping...........................................................................................................3 <br />2.2.2. Pump........................................................................................................... 3 <br />2.3. STORAGE..........................................................................................................3 <br />2.4. VISUAL INSPECTION....................................................................................... 3 <br />3.0. SECONDARY CONTAINMENT............................................................................3 <br />3.1. WASTE OIL TANK (AST) DESIGN.................................................................... 3 <br />3.2. VISUAL INSPECTION.......................................................................................4 <br />4.0. HYDROSTATIC TEST..........................................................................................4 <br />4.1. HYDROSTATIC TEST PROCEDURE...............................................................4 <br />4.2. HYDROSTATIC TEST RESULTS................................................................... 4 <br />5.0. SEISMIC ANALYSIS.............................................................................................5 <br />5.1. SEISMIC CALCULATION.................................................................................. 5 <br />5.1.1. AST Specifications...................................................................................... 5 <br />5.1.2. Seismic Calculation Results........................................................................ 5 <br />5.2. SEISMIC ANCHORING..................................................................................... 5 <br />5.3. INTEGRITY TEST FINDINGS............................................................................ 6 <br />6.0. DISCREPANCIES AND NON-COMPLIANT ISSUES...........................................6 <br />7.0. LIMITATIONS.......................................................................................................6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.