Laserfiche WebLink
FREE classes presented by NES Inc. are available to al l San Joaquin County Hazardous Waste, Underground Storage Tank, <br /> and Aboveground Petroleum Storage Facility Business Owners and Operators. List and schedule of classes can be found <br /> here. <br /> Thank you, <br /> Cesar Ruvalcaba <br /> San Joaquin County Environmental Health Department <br /> Environmental Health Specialist <br /> 1868 East Hazelton Ave <br /> Stockton,CA 95205 <br /> W (209)953-6213 1 A (209)464-01381 ® cruvalcabaPsiaov.ora <br /> SANeIOApUIN <br /> COUNTY <br /> �'-y' Gee��ess ga.a hese. <br /> From: DPaul<spccorp@hotmail.com> <br /> Sent: Wednesday,July 10,2019 12:32 PM <br /> To:Gary delCarlo<hfstracyca@msn.com>; Ruvalcaba,Cesar<cruvalcaba@sjgov.org>; Dave Harris <br /> <daveh @ donleepump.com> <br /> Subject: Haley Flying Service <br /> Gary: <br /> Please note the following issues which must be implemented to finalize a"corrective action" plan per the <br /> recent NOV issued by Inspector Ruvalcaba---I have cc'd him because I debriefed him following our onsite <br /> inspection yesterday. This is the best insurance for our following the corrective plan to address any <br /> deficiencies he noted: <br /> 1. We need to either install 2ndary containment around the 1000-gallon AST(this is why I cc'd Dave <br /> Harris of Donlee Pump who is a resource for providing either a retro-fit 2ndary basin OR a replacement <br /> AST) <br /> 2. We need to install a Baker-Box or other equivalent overfill container for the 1000 gallon AST as well <br /> (Dave of Donlee Pump can assist here also) <br /> 3. SPC Corp proposed to rewrite the existing SPCC plan (@ no addl charge to YOU)to address numerous <br /> compliance issues identified by Mr. Ruvalcaba's evaluation. We will utilize the new 2018 Tier 11 format <br /> on your behalf. This will include references to mobile fueling, 55-gal drums onsite, waste oil/coolant <br /> storage, etc.AND will include supplemental photos as well as a map/diagram of the facility with <br /> increased detail to address Mr. Ruvalcaba's concerns. <br /> 4. While none of the tanks at your business registered any discharge(leak, rupture, spill, etc.) as a result <br /> of yesterday's inspection/tests, we will ultimately need to come back in 2020 to re-certify the next <br /> SPCC plan and retest each of the tanks. <br /> 5. We will also be using the STI SP001 test-format/forms per Mr. Ruvalcaba's instructions (at no addl <br /> charge to you) within the overall SPCC plan. <br /> 6. Our target is to have the DRAFT completed by Friday, 7/12/2019 which will include red=line comments <br /> for any corrective-action items which are "in-process". Upon completion,these corrective-action items <br /> will be converted to blue-line remarks within the final SPCC plan. <br /> 2 <br />