My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
15971
>
2800 - Aboveground Petroleum Storage Program
>
PR0515798
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 11:37:55 AM
Creation date
1/8/2019 9:26:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515798
PE
2832
FACILITY_ID
FA0009326
FACILITY_NAME
HALEY FLYING SERVICE INC
STREET_NUMBER
15971
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
18912012
CURRENT_STATUS
01
SITE_LOCATION
15971 S TRACY BLVD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention Compliance Corporation <br /> P.O. Box 1289....Waterford, CA 95386 Telephone: (209) 969-0851 <br /> email: sMcorpRhotmail.com <br /> Amendment of SPCC Plan by Owner/Operators (all issues t/b reviewed & <br /> certified by SPC Corp Professional Engineer/PE) <br /> Line item#301—Owner/Operator has NOT upgraded 1000 gal AST to <br /> doublewall/2ndary containment. Work in process. <br /> Additional concerns: Waste oil/Waste Coolant being amended to SPCC plan (note <br /> attached photos of recent onsite inspection/testing). <br /> General Requirements for SPCC Plans <br /> Line-item#601 DRAFT SPCC plan w/references in process. This is being <br /> coordinated with the NOV in the Table of Contents (see DRAFT) <br /> Line-item#603—Map and Satellite Diagrams being prepared as addenda to SPCC <br /> plan. <br /> Line-item#609---Discharge procedures included in DRAFT SPCC plan <br /> Line-item#618—Owner/Operator coordinating with Donlee Pump to replace <br /> existing 1000-gal singlewall AST. Also, numerous vacant (no product being <br /> stored) require"out-of-service" placards t/b affixed/installed. <br /> Line item#618—SPC Corp retains 2015 periodic integrity records/field data- <br /> sheets also available and will provide these in the finalized SPCC plan revisions. <br /> Line item#628---Federal/state and local citations will be cross-referenced as <br /> required in the revised SPCC DRAFT pending finalization (see attached DRAFT) <br /> SPCC Plan Requirements for Onshore Facilities <br /> Line item#706—Only 2ndary containment deficiency remaining is 1000-gal diesel <br /> AST which is in-process for either retrofit or replacement by Donlee Pump. Waste <br /> oil/coolant drums are EXEMPT due to gallonage below threshold BUT do include <br /> 2ndary containment pallets. <br /> Nurse-tanks (see numerous photos) are exempt from both federal and state <br /> requirements but are included for gallonage-reporting requirements. <br /> Line-item#710---Supplemental spcc plan to address in section 3.3 and 3.4 as well <br /> as Table 3-5 the specific test procedures utilized in the onsite inspections. Original <br /> proposal was to convert all the existing test-certificates to the STI SP001 formats <br /> which can still be done. <br />
The URL can be used to link to this page
Your browser does not support the video tag.