Laserfiche WebLink
Ruvalcaba, Cesar <br /> From: Ruvalcaba,Cesar <br /> Sent: Monday,July 22,2019 9:33 AM <br /> To: 'DPaul' <br /> Subject: RE: Haley's Flying Service - PR0515798 <br /> Hi Paul, <br /> I am not sure what the email is referring too.The regulations require the review and evaluation of the SPCC plan at least <br /> once every 5 years.This is if there weren't any changes to the plan during the 5 years.The five year review does not <br /> require a certification of a professional engineer,as long as there weren't any technical changes If there is a technical <br /> amendment before the 5 years,then the plan must be amended and the plan or the amendments certified by the a <br /> professional engineer <br /> Here is what the regulations state <br /> §112.5 Amendment of Spill Prevention, Control,and Countermeasure Plan by owners or operators. <br /> If you are the owner or operator of a facility subject to this part, you must: <br /> (a) Amend the SPCC Plan for your facility in accordance with the general requirements in §112.7, and with any <br /> specific section of this part applicable to your facility,when there is a change in the facility design,construction, <br /> operation,or maintenance that materially affects its potential for a discharge as described in §112.1(b). Examples of <br /> changes that may require amendment of the Plan include, but are not limited to:commissioning or decommissioning <br /> containers; replacement, reconstruction,or movement of containers; reconstruction, replacement,or installation of <br /> piping systems;construction or demolition that might alter secondary containment structures;changes of product or <br /> service;or revision of standard operation or maintenance procedures at a facility. An amendment made under this <br /> section must be prepared within six months, and implemented as soon as possible, but not later than six months <br /> following preparation of the amendment. <br /> (b) Notwithstanding compliance with paragraph (a)of this section,complete a review and evaluation of the <br /> SPCC Plan at least once every five years from the date your facility becomes subject to this part;or, if your facility <br /> was in operation on or before August 16,2002,five years from the date your last review was required under this <br /> part.As a result of this review and evaluation,you must amend your SPCC Plan within six months of the review to <br /> include more effective prevention and control technology if the technology has been field-proven at the time of the <br /> review and will significantly reduce the likelihood of a discharge as described in §112.1(b)from the facility. You must <br /> implement any amendment as soon as possible, but not later than six months following preparation of any <br /> amendment.You must document your completion of the review and evaluation, and must sign a statement as to <br /> whether you will amend the Plan, either at the beginning or end of the Plan or in a log or an appendix to the Plan. <br /> The following words will suffice, "I have completed review and evaluation of the SPCC Plan for(name of facility)on <br /> (date), and will (will not) amend the Plan as a result." <br /> (c) Except as provided in §112.6, have a Professional Engineer certify any technical amendments to your Plan <br /> in accordance with §112.3(d). <br /> FREE classes presented by NES Inc. are available to all San Joaquin County Hazardous Waste, Underground Storage Tank, <br /> and Aboveground Petroleum Storage Facility Business Owners and Operators. List and schedule of classes can be found <br /> here. <br /> Thank you, <br /> 1 <br />