My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
15971
>
2800 - Aboveground Petroleum Storage Program
>
PR0515798
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 11:37:55 AM
Creation date
1/8/2019 9:26:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515798
PE
2832
FACILITY_ID
FA0009326
FACILITY_NAME
HALEY FLYING SERVICE INC
STREET_NUMBER
15971
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
18912012
CURRENT_STATUS
01
SITE_LOCATION
15971 S TRACY BLVD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ruvalcaba, Cesar <br /> From: DPaul<spccorp@hotmaitcom> <br /> Sent: Monday,September 2,2019 9:08 AM <br /> To: Ruvalcaba,Cesar <br /> Subject: Haley's Flying Service submittal(s) <br /> Attachments: Return to Compliance CertrficationHaleys2019.docK <br /> SPCCpianHaleyFlying_Jan2011FinalDrak.docc; HaleysFlyingSvc2019.pptx <br /> Cesar: <br /> Please find attached: <br /> 1. A DRAFT Return to Compliance certificate---t/b finalized after you have reviewed the Final DRAFT of <br /> the SPCC plan (which will ultimately be paginated and wet-stamped by our PE upon your <br /> recommendations)--SPC Corp will ultimately assist the owner/operator in the completion of this <br /> submittal. <br /> 2. A Final DRAFT of the current SPCC plan (to be re-composed and re-certified in January of 2020)with all <br /> revisions identified by greenline text. The greenline text will be converted to blueline text following <br /> your review/approval of the said revisions. This is in accordance to traditional "sound engineering <br /> practices" to create an audit trail for revisions. Following PE wet-stamp/certification,the <br /> owner/operator will be requested to provide you a formal copy of the document. The Final SPCC plan <br /> will include: <br /> a) a copy of the NOV <br /> b) a copy of the Return to Compliance certificate <br /> c) both entries will also be paginated in the Table of Contents for cross-reference purposes <br /> per your requirements. <br /> 3. Current photo supplement to the Final DRAFT SPCC plan; we have NOT included diagrams, schematics, <br /> aerial layouts as they remain in electronic format to be revised as you stipulate. They will eventually be <br /> included in the final section of the Final SPCC plan. <br /> Thank you for your patience in this project; we/SPC Corp recognize there are some remaining steps to reach <br /> compliance in your jurisdiction--the owner/operator is undertaking these and will independently coordinate <br /> them with you (e.g., installation of O/F boxes, removal/replacement of gasoline tank, signage of"out-of- <br /> service" containers, etc.). Feel free to contact me for any additional issues you feel need to be addressed to <br /> bring this FBO into compliance. <br /> D. Paul McWhorter, CEO <br /> SPC Corporation <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.