My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VERNALIS
>
9000
>
2200 - Hazardous Waste Program
>
PR0541637
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 4:59:16 PM
Creation date
1/11/2019 4:49:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541637
PE
2226
FACILITY_ID
FA0009758
FACILITY_NAME
SFPUC Tesla Treatment Facility
STREET_NUMBER
9000
Direction
W
STREET_NAME
VERNALIS
STREET_TYPE
Rd
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
9000 W Vernalis Rd
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1534 Willow Pass Road,Pittsburg,CA 94565-1701 <br /> }_ M C C a m g b e l l Analytical, Inc. Toll Free Telephone:(877)252-9262/Fax:(925)252-9269 <br /> "When Quality Counts" http://www.mccampbell.com/E-mail:main@mccampbell.com <br /> WORK ORDER SUMMARY <br /> Client Name: AEW ENGINEERING,INC. Project: 2018-035;Tesla Hg Trench Cleanup Work Order: 1812586 <br /> Client Contact: Randy Young QC Level: LEVEL 2 <br /> Contact's Email: ryoung@aeweng.com Comments:Hold all soil samples for 6mos per Ken Leung 3/14/14 Date Logged: 12/12/2018 <br /> ❑WaterTrax ❑WriteOn ❑EDF 0 Excel ❑EQuIS 0 Email ❑HardCopy ❑ThirdParty ❑J-flag <br /> Lab ID Client ID Matrix Test Name Containers Bottle&Preservative De- Collection Date TAT Sediment Hold SubOut <br /> /Composites chlorinated &Time Content <br /> 1812586-OOIA Trench Conf Water E200.8(Metals)(Dissolved-Lab 1 250mL HDPE,unprsv. ❑ 12/12/2018 10:55 1 day 2%+ <br /> Filtered)<Mercury> <br /> NOTES: -STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One-day TAT yields results <br /> in 3 days from sample submission). <br /> - MAI assumes that all material present in the provided sampling container is considered part of the sample - MAI does not exclude any material from <br /> the sample prior to sample preparation unless requested in writing by the client. <br /> Page 1of1 <br /> Page 7 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.