Laserfiche WebLink
SA J 0 A Q t I N Environmental Health Department <br /> —COUNTY- <br /> Complaint Record Daily Time and Activity Summary from 1/1/2017 to <br /> 1/30/2018 for C00046774 located at <br /> METTLER AND LOWER SACRAMENTO RD <br /> Activity Date Recorded by <br /> 05/31/2018 Received complaint from front counter. Called Alex Steele of PG&E and verified PE 2546 FLORIDO <br /> 24 min 60 gallon transformer oil spill to soil and no waterways impacted. Clean-up will SC 544 <br /> begin once USA clears. Wrote complaint on white board next to Muniappa N.'s <br /> office. Notified Muniappa N. of the spill. <br /> 05/31/2018 Notification of Hazardous Waste Discharge. PE 2546 FLORIDO <br /> 30 min SC 203 <br /> 05/31/2018 Generated Emergency Response Record Form and site map. PE 2546 FLORIDO <br /> 18 min SC 544 <br /> 05/31/2018 On site and witnessed a pad mounted transformer with a Non-PCB sticker PE 2546 FLORIDO <br /> 78 min damaged with oil spillage on the soil surrounding the transformer. Met with Dave SC 544 <br /> Larsen of PG&E, who indicated the excavation of the area will begin on 6/4/2018 <br /> once the USA clears. Dave Larsen agreed to take a sample of the transformer oil <br /> to verify it is Non-PCB. PG&E to notify EHD when the excavation will take place in <br /> order to verify clean-up completion prior to backfill. PG&E to provide EHD with the <br /> sample analytical results prior to waste disposal, as well as final disposal records. <br /> Generated and emailed the Notice to Abate to Alex Steele of PG&E. <br /> 06/01/2018 Generated and printed photo log. PE 2546 FLORIDO <br /> 18 min SC 544 <br /> 06/06/2018 Called and spoke to Alex Steele to get an update on the clean-up. Alex said the PE 2546 FLORIDO <br /> 6 min clean-up has not been performed yet, but will hopefully get done this week. Alex is SC 544 <br /> going to check in the Dave Larsen's schedule to find out when Dave will have time <br /> to do this clean-up. Alex indicated that he thins the oil sample analytical has been <br /> received, and he will provide it to me once he finds it. <br /> 06/06/2018 Received a call from Alex Steel who notified me Dave Larsen would likely conduct PE 2546 FLORIDO <br /> 12 min this clean-up tomorrow afternoon, given he is able to complete another clean-up in SC 544 <br /> the morning. Alex indicated he would let me know tomorrow morning. <br /> Received another call from Alex Steele notifying me the clean-up would not <br /> happen until Friday, since Dave Larsen has to take tomorrow off work. <br /> 06/08/2018 While I was witnessing the clean-up of another spill, Dave Larsen and Alex Steel PE 2546 FLORIDO <br /> 18 min of PG&E indicated that the clean up for this spill will be started today, but will likely SC 544 <br /> not be completed until tomorrow. I told Dave that our weekend on call person, <br /> Elena Manzo, will have to witness the clean-up. I told Dave I would let Elena know <br /> to give him a call to get a time as to when the clean-up will be completed. Dave <br /> agreed. <br /> I notified Elena of the clean-up to be completed tomorrow. I provided Elena with <br /> the complaint documentation and Dave Larsen's phone numbers. Elena indicated <br /> she would follow up with Dave to witness the clean-up. <br /> 06/08/2018 Follow up with Dave Larsen 209-401-9719, left a message asking for the ETA for PE 2546 MANZO <br /> 18 min clean up, provided my contact information. Received a call back from Dave, he SC 544 <br /> indicated that excavation will commence tomorrow. He will call me and let me <br /> know 2 hours in advance of being done. <br /> 06/08/2018 Called Dave Larson asked for the plan to clean up this spill, he indicated that the PE 2546 MANZO <br /> 12 min spill was soy bean oil and that he is planing to excavate tomorrow. He will give me SC 544 <br /> a call when they are a few hours before finishing up. <br /> Page 1 of 2 <br />