Laserfiche WebLink
F30 'W Installer Attestation No. 0154737 <br /> +u,�IMMfk{I icatinepr - � {_i•. �j <br /> Rafael Flores <br /> VR-102 Walton Engineering, Inc. 946 ti6� y <br /> V <br /> EVR UST Certification Course � a <br /> on: 1/3/2019 Exp Date: 01/02/2021 <br /> Completion of this training course roes not create a wa,ranty or guaranty by IM of your instal laton <br /> end,-'or maintenance of nozzles,vapor recovery systems and EVR PHASE I systems.This train ng <br /> course does not eliminate the need to strictly acne to manufactuer nstmctons am;),ocedues <br /> when installing and maintaining nozzles,vapor recovery systems and EVR PHASE I Systems.All <br /> nozzles,vapo,recovery systems and R'R PHASE I Systems rr,st be Istalle< ant maintained in <br /> accordance witn manufacture'nstr.ctions and piocedures.Attestdton aPPlies 1 MILv to tested named <br /> individual. <br />