My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
2300 - Underground Storage Tank Program
>
PR0543446
>
INSTALL 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 10:52:47 AM
Creation date
1/16/2019 2:16:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0543446
PE
2351
FACILITY_ID
FA0024656
FACILITY_NAME
7-ELEVEN #38153
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
121 S CENTER ST
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
631
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
installed and aligned facing the entry point of the flexible pipe <br />sections. <br />11.2.1 Coax Connections To Tank Fittings <br />Install the coax pipe adapters into the pipe fittings to <br />accommodate the coax pipe couplings installed <br />to the end of the flexible pipe sections. The adapters are <br />attached by first applying thread sealant to the male pipe <br />threads. Then hand tighten firmly followed by two full turns <br />with a pipe wrench. <br />CAUTION: Do not apply the plumbing wrench to the <br />section of the pipe adapter which contains the test port. <br />NOTE: For coaxial fitting NPT threads, use only UL°' <br />classified thread sealant specifically formulated for <br />gasoline and petroleum products. Do not overtighten <br />coax type fittings. <br />11.2.2 Metallic Connections To Tank Fittings <br />Install the metallic pipe adapters into the pipe fittings to <br />accommodate the metallic pipe couplings installed to the <br />end of the flexible pipe sections. <br />12.0 DISPENSER SUMP PIPE CONNECTIONS <br />The plumbing connections <br />required inside dispenser sumps <br />can be simple or complicated <br />depending upon the plumbing <br />requirements, dispenser size, and <br />pipe entry locations. Pipe entries <br />that are located considerably off <br />the center line may require the use <br />of flex connectors as riser pipes <br />instead of rigid steel riser pipes. <br />For some dispenser models, the <br />pipe entries are located so close to the wall of the dispenser <br />that product offsets are required. The type of piping <br />application specified shall determine what type of piping <br />connections shall be made inside dispenser sumps. <br />NOTE: Prior to all flexible piping connections in <br />dispenser sumps the riser pipe assemblies must be <br />installed and test boots, if used, must be installed. <br />12.1 Riser Pipe Assemblies <br />Riser pipe assemblies are designed to interconnect one <br />or two flexible pipe sections to the above ground product <br />dispenser. At the top end they may or may not be fitted <br />with a shear valve and are typically mounted to a stabilizer <br />bar. At the low end they may be fitted with either tee fittings <br />or elbow fittings. Refer to the following riser pipe options <br />available with OPW-FCS's flexible piping system. <br />12.1.1 Steel Pipe Riser Measuring: <br />Cutting the steel riser pipe to the proper length will <br />allow the piping to enter the dispenser sump on a straight <br />and level plane and in line with the tees, elbows and <br />adapters. Improper riser length results in stress at the pipe <br />fitting/pipe coupling connection. Please follow the steps <br />noted below: <br />• Install the stabilizer bars in their proper position, per <br />OPW FCS Stabilizer Bar Installation Instructions, which <br />10 <br />F/exWOQ R KS <br />BY OPW FUELING CONTAINMENT EYETEME <br />can be determined by the dispenser manufacturer's <br />footprint for the particular dispenser model. This will allow <br />for proper vertical alignment. <br />Install the shear valve to the shear valve mounting plate <br />and secure this to the stabilizer bar in accordance with <br />the dispenser manufacturer's footprint. <br />Install the entry boots in accordance with the OPW-FCS <br />Flexible Entry Boot installation instructions. <br />• Line up the center of the entry boot with the center of the <br />opening of the tee, elbow or adapter. <br />• Determine the length of the steel riser by measuring <br />between the bottom of the shear valve and the top of the <br />tee, then add 1-1/2" to that length prior to cutting the NPT <br />threads for each end of the riser. <br />• Install the riser to the top of the shear valve with the use <br />of soft set pipe dope that is approved for use with <br />petroleum products. <br />• Install the tee, elbow or adapter to the bottom of the riser, <br />positioning it properly to align with the entry boot <br />horizontally, with the use of soft set pipe dope that is <br />approved for use with petroleum products. <br />• Reinstall the riser set up to the stabilizer bar and then <br />make sure that the tee, elbow or adapter opening is on <br />center with the entry boot opening on both the horizontal <br />and vertical plane. <br />Assure that the opening of the tees, elbows or adapters <br />are all on center with the entry boot, on both the <br />horizontal and vertical plane. <br />12.2 Non -Contained Riser Pipe <br />Non -contained riser pipe assemblies are only permitted if <br />they are to be installed inside dispenser sumps. These riser <br />pipes assemblies may have a coax or swivel fitting installed <br />at the base of the steel riser pipe. <br />13.0 FLEXIBLE PIPE FABRICATION <br />After all plumbing trees have been installed inside the tank <br />sumps and riser assemblies installed into either the deep or <br />shallow dispenser sumps, fabrication and installation of the <br />flexible piping may proceed. <br />IMPORTANT: Only currently certified contractors with <br />a valid factory training card are authorized to install Flex <br />piping. <br />13.1 Pipe Handling At Jobsite <br />Care must always be taken when handling OPW-FCS's <br />flexible piping to prevent damage. It is recommended that <br />the carton be placed in the sunlight several hours before <br />measuring and cutting the pipe, so the pipe may relax for <br />easier extension when measuring. <br />WARNING: Do not drag, cut or scrape the pipe during <br />installation to avoid damage to the external surface of <br />the piping. Use only OPW-FCS approved backfill <br />
The URL can be used to link to this page
Your browser does not support the video tag.