Laserfiche WebLink
24.0 GUIDE SPECIFICATIONS <br />24.1 Short Form <br />The contractor shall provide a flexible underground piping <br />system whereby the flexible piping, fittings, adapters and <br />under dispenser riser pipes are secondarily contained and <br />having no metallic components exposed to the <br />environment. The primary pipe shall be capable of being <br />air pressure tested to 1.5 times the operating pressure of <br />the pump not exceeding 60 psi. The secondary shall be <br />capable of being air tested to 10 psi. <br />24.2 Long Form <br />The following guide specification is designed around the <br />use of OPW-FCS's flexible piping. <br />24.2.1 Design <br />The contractor shall provide a secondarily contained <br />flexible underground piping system that shall provide <br />secondary containment for all primary piping, couplings, <br />fittings and adapters. Piping runs shall be continuous <br />between containment chambers (ie., tank & dispenser <br />sumps or pans) in which all joints are contained within <br />the containment chambers. The piping design shall allow <br />for any leak in the primary supply or secondary <br />containment piping to be directed to a leak detection <br />sensor. <br />24.2.2 Product And Chemical Compatibility <br />The flexible underground piping and associated <br />couplings, fittings and adapters shall be chemically <br />compatible with the products to be transported and with <br />chemicals found naturally in the ground environment. <br />The primary & sec-ondary piping shall be compatible <br />with gasoline, alcohols, gasoline -alcohol mixtures and all <br />EPA approved additives, including MTBE. <br />24.2.3 Corrosion Resistance <br />The flexible underground piping and associated <br />couplings, fittings and adapters which come in contact <br />with the ground environment shall be made of non- <br />metallic <br />material or encapsulated by non-metallic components <br />which prevent corrosion. <br />24.2.4 Structural Integrity <br />The flexible underground piping and associated <br />couplings, fittings and adapters shall be designed and <br />constructed of materials strong enough for its intended <br />use. The flexible piping shall not collapse, crack or break <br />due to ground movement or from backfill and high <br />ground water pres-sures. Piping shall be able to transfer <br />fluid up to a maximum temperature of 125 degrees <br />fahrenheit (52 degrees celsius). Piping shall be <br />operational with in a temperature band of minus 40C <br />and +65C. <br />24.2.5 Bend Radius <br />The double wall flexible piping shall be capable of a min- <br />imum bend radius without kinking, cracking or breaking. <br />The minimum bend radii shall be equal to or less than <br />the following: <br />0.75" - 18" radius <br />1.0" - 18" radius <br />19 <br />F/Eex1N(0R KS <br />BY OPW FUELING CONTAINMENT SYSTEMS <br />1.5" - 24" radius <br />2.0" - 36" radius <br />3.0" - 48" radius <br />24.2.6 Fluid Flow Efficiency <br />Both the primary inner and secondary outer pipe shall have <br />an interior surface which is a smooth (non -corrugated) profile <br />and be made of a low friction resistant material for improved <br />fluid flow efficiency. <br />24.2.7 Operating Pressures & Vacuums <br />The flexible underground piping shall have a minimum five <br />to one (5:1) safety factor from maximum operating pressure <br />for rated pressure. The maximum operating pressure rating <br />for 1.5" diameter piping shall be 100 psi primary and 10 psi <br />secondary. 3/4", V, 2" and 3" piping shall be rated at a <br />maximum operating pressure of 75 psi primary and 10 psi <br />secondary. For suction systems the pipe shall be capable <br />of withstanding 29" mercury vacuum. <br />24.2.8 Pipe Expansion <br />The primary supply pipe shall not expand more than .0025% <br />in diameter and overall length when pressurized to 60 psi <br />to permit accurate pressure decay readings by an in-line <br />leak detector. <br />24.2.9 Interstitial Interconnection <br />All primary and secondary piping shall be connected <br />in such a way as to permit integrity testing both during <br />installation and at periodic intervals in the future. Both <br />primary and secondary piping shall remain continuous <br />during operation. <br />24.2.10 UL® Testing <br />Flexible piping and it's associated fittings shall be <br />independently tested in accordance with UL 971. <br />25.0 Storage and Handling <br />25.1 Storage <br />OPW-FCS requires that all piping, fittings and system <br />components be stored in such a manner that they <br />will not be subject to direct sunlight and / or excessive <br />environmental conditions. Please review the below <br />noted warnings during product storage. <br />• Cover all products with UV protective tarps if outside. <br />• If tarps are unavailable, store in trailer or building until <br />use. <br />25.2 Handling <br />OPW-FCS requires that the piping, fittings and system <br />components are handled in such a manner that it will not <br />cause unnecessary damage to the system components. <br />Please review the below noted warnings during product <br />handling. <br />• Do not drop, cut or impact the components. <br />• Keep all piping, fittings and components in the original <br />packaging until ready to use. <br />• Keep all thread protectors secure until ready to use. <br />