My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
2300 - Underground Storage Tank Program
>
PR0543446
>
INSTALL 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 10:52:47 AM
Creation date
1/16/2019 2:16:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0543446
PE
2351
FACILITY_ID
FA0024656
FACILITY_NAME
7-ELEVEN #38153
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
121 S CENTER ST
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
631
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r,Mfsn. c 3 C2-) <br /> • ?•'--E'r''+•� SAN JOAQUIN COUNTY �P, o 4 <br /> r. i ENVIRONMENTAL HEALTH DEPARTMENT <br /> 1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br /> Telephone:(209)468-3420 Fax.(209)468-3433 Web:www.siaov.orci/ehd <br /> 4C%PORN; <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br /> Facility Name: Inspection Date: <br /> Facility Address: Service Request#: <br /> lad S. f S�uc -yak <br /> Otis' <br /> r;q Service TechniCia ' Name: ICC Service Techn ian/Installer Exp.Date: Manufacturer Training: <br /> SERVICE SERVICE <br /> Leak detector Spill bucket ❑ minimum 5 gallon <br /> 11 ❑ mechanical Model: ❑ ❑ 1 hour hydrostatic ❑ Incon TS-STS <br /> ❑ electronic Serial#: ❑ Caldwell System ❑ Other <br /> ❑ line test programmed <br /> Leak detector Spill bucket ❑ minimum 5 gallon <br /> ❑ ❑ mechanical Model: ❑ ❑ 1 hour hydrostatic ❑ Incon TS-STS <br /> ❑ electronic Serial#: ❑ Caldwell System ❑ Other <br /> ❑ line test programmed <br /> sensor <br /> ❑ positive shutdown Model: Primary piping testing at: <br /> E] El _psi <br /> ❑ fail safe Serial #: <br /> El NA minutes <br /> sensor Secondary containment testing for: <br /> ❑ ❑ positive shutdown Model: UDC(s) Piping <br /> ❑fall safe Serial #: Sump(s) UST(s) <br /> ❑ NA <br /> sensor ❑ Testing for the above components are next due by: <br /> ❑ ❑ positive shutdown Model: <br /> ❑fail safe Serial#: Note: Please be aware that 2°containment components are required to be tested upon <br /> ❑ NA Instailabon,6 months atter,and every 36 months thereafter. <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Cold start of monitoring panel <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Corrosion protection <br /> ❑ Overfill prevention (see LG letter 150-1) ❑ Other: see below <br /> ❑ This UST facility is APPROVED to operate This UST facility is NOT APPROVED to operate <br /> Ct GeOfYAA `_l'k <br /> Q LA ib<k <br /> I —A 1 V"i <br /> 1 `I t 1 v- <br /> G.cQ tv)-4,Li w t u 16e r I YQd F Pf' <br /> u - <br /> THIS FACILITY 15 SUBJE T TO REINSPECTION AA ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspectoy�lil R i ed y: Title:le: <br /> 0r--0/e of kh <br /> EHD 23-04 UST SERVICE REQUEST INSPECTION REPORT <br /> Rev 4/30/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.