My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
2300 - Underground Storage Tank Program
>
PR0543446
>
INSTALL 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 10:52:47 AM
Creation date
1/16/2019 2:16:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0543446
PE
2351
FACILITY_ID
FA0024656
FACILITY_NAME
7-ELEVEN #38153
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
121 S CENTER ST
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
631
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON <br /> Overfill Prevention Inspection - OPW 61 and 71 Series Devices <br /> Date: <br /> Owner: <br /> Facility: <br /> OPW Overfill Model Number: <br /> Part 1 - Proper Height Setting Calculation <br /> Tank 1 Tank 2 Tank 3 Tank 4 <br /> Maximum Tank Volume Per: A Gallons <br /> Max shut off requirement for flapper is 95% B 95% <� <br /> Multiply Max tank volume by 95% C Gallons <br /> Use tank chart or ATG to determine height of <br /> calculated volume n InchesAV 7 <br /> Measure top of fill riser threads,or face seal <br /> adapter i.Inches <br /> Tank:diameter(From Tank Chart) F inches /.F ' <br /> Upper Tube in Tank(G)F-D=G G Inches ' <br /> Subtract 2"from upper tube in tank G-2"=K K Inches <br /> Calculated minimum upper tube lenarth(1) <br /> K+E=I IInches <br /> Actual measured upper tube length (Without <br /> fill adapter)(J) J Inches <br /> Part 2 - Device Certification Criteria Evaluation <br /> Does the overfill prevention device meet the 95% <br /> requirement? <br /> Is the actual measured upper tube length 6.5 inches or <br /> more than the fill riser?(J must be 6.5"or more than E) <br /> Does the overfill prevention device function as required? <br /> (Inspect the device for damage,contamination,freedom of <br /> movement.weakening due to wear and corrosion) <br /> Device Overfill Certification PASS/FAIL <br /> Dro Tube Testing PASS /FAIL. ; <br /> Technician certifies that the device is operationally compliant. <br /> Signature of Technician: Date: <br /> Technician's Name: J� <br /> le <br />
The URL can be used to link to this page
Your browser does not support the video tag.